SECTION IV: COIL INSTALLATION

FURNACE ASSEMBLY - MC & FC

These coils are factory shipped for installation in either upflow or down-
flow applications with a minor conversion.

For Upflow Application:

1.

Position the coil casing over or under the furnace opening as
shown in Figure 5 after configuring coil flanges as required see
“Coil Flange” section below and refer to Figure 7.

2.

Slide up the sides and back flange and tight the 6 screws that hold
them. Refer to Figure 6.

3.

Unscrew the front flange and move it to the top to align it to the
rest of the flanges allowing to screw it back to the brace using the
2 holes in the bottom of the front flange. Refer to Figure 6.

4.

Place the ductwork over the coil casing flange and secure.See
sections on "Refrigerant L ine Connections" and "Condensate
Drain Connections". One mounting plate is provided with the coils.

For Downflow Application:

1.

Position the coil casing over or under the furnace opening as
shown in Figure 5 after configuring coil flanges as required see
“Coil Flange” section below and refer to Figure 7.

2.

Remove all 8 screws from flangs and position them at the bottom
of the casing for the alternate position. Refer to Figure 7.

3.

Place the ductwork over the coil casing flange and secure.See
sections on "Refrigerant Line Connections" and "Condensate
Drain Connections". One mounting plate is provided with the coils

COIL FLANGE - FOR DOWNFLOW AND HORIZONTAL 

LEFT KIT INSTALLATION

The coils include removable flanges to allow proper fit up with furnaces
or two-piece air handlers having various inlet and outlet flange configu-
rations. The two flanges are attached to the top of the coil in the factory
during production. If the installation requires the flanges to be moved to
the bottom of the coil, remove the screws attaching the flanges to the
top of the coil casing. Next, install the flanges to the bottom of the coil
casing using the same screws. Refer to Figure 7.

The additional holes in the upper area of the flanges may be used to
attach the coil to the furnace or two-piece air handler. This is done by
installing field-supplied screws through the flanges into the inside of the
furnace or two-piece air handler casing.

The front flange is also designed so that it can be rotated 180 degrees
and re-installed. In this mounting configuration the front flange will
extend further to the front of the coil casing to accommodate furnaces
or two-piece air handlers that have a greater front-to-back dimension
than the coils.

 FIGURE 5:  

Vertical Applications

UPFLOW

DOWNFLOW

Furnace

Furnace

 FIGURE 6:  

Coil Flange Placement

When installing this coil with an oil furnace, a minimum of six inches
clearance should be maintained from the top of the heat exchanger.

 FIGURE 7:  

Coil Flange

NOTICE

Alternate
Flange Location

Factory

Flange

Location

Содержание MC

Страница 1: ...hazardous situation which if not avoided will result in death or serious injury WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION...

Страница 2: ...MC Coils Only Primary Drain Secondary Drain Bottom Door Panel FIGURE 2 Component Location Coil PC Label Location Coil Access Panel Primary Drain Secondary Drain Bottom Door Panel Alternate Drain Locat...

Страница 3: ...See York bulletin 690 01 AD1V for details 20 3 8 Opening B C 3 4 Flange A 21 1 2 BOTTOM OPENING DIMENSIONS D 20 1 4 TABLE 3 Dimensions PC Coils Models Dimensions 1 Refrigerant Connections 2 Height Wid...

Страница 4: ...0 1350 42 3 1050 1350 3 1 2 1225 1575 43 3 1050 1350 3 1 2 1225 1575 48 3 1050 1350 3 1 2 1225 1575 4 1400 1800 60 62 64 4 1600 1800 5 1750 2250 For models that have factory installed TXV s take cauti...

Страница 5: ...ns and Condensate Drain Connections One mounting plate is provided with the coils COIL FLANGE FOR DOWNFLOW AND HORIZONTAL LEFT KIT INSTALLATION The coils include removable flanges to allow proper fit...

Страница 6: ...handled in one of several ways best suited to the installation Upflow horizontal or downflow applications may be used The vast majority of problems encountered with combination heating and cooling sys...

Страница 7: ...n it should be piped to a loca tion that will give the occupant a visual warning that the primary drain is clogged If the secondary drain is not used it must be capped DO NOT use TeflonTM tape pipe do...

Страница 8: ...il using a portable manometer and static pressure tips To prepare coil for static pressure drop measurements the system should have been recently operational in cooling mode Drill 2 holes one 3 after...

Страница 9: ...TXV Bulb positioned correctly Is Bulb Insulated Is Equalizer Line connected FIGURE 16 Drain Traps Secondary Primary 3 Min Were the primary and secondary drains trapped correctly FIGURE 17 Location of...

Страница 10: ...change without notice Published in U S A 841890 UIM B 0612 Copyright 2012 by Johnson Controls Inc All rights reserved Supersedes 841890 UIM A 0412 York International Corp 5005 York Drive Norman OK 73...