SECTION II: GENERAL INFORMATION

This instruction covers the installation of the following coils with 80+ or
90+ AFUE furnaces or MA/MX/MV air moving systems.

The coils have sweat connect fittings. All coils are shipped with a low
psi nitrogen holding charge.

INSPECTION

As soon as a coil is received, it should be inspected for possible dam-
age during transit. If damage is evident, the extent of the damage
should be noted on the carrier’s delivery receipt. A separate request for
inspection by the carrier’s agent should be made in writing. See Local
Distributor for more information. Check drain pan for cracks or break-
age.

CLEARANCES

DURING INSTALLATION

Clearance must be provided for: 

1.

Refrigerant piping and connections

2.

Maintenance and servicing access - including cleaning the coil

3.

Condensate drain line

4.

Filter removal / change

5.

Removal of coil assembly

 FIGURE 1:  

Component Location - Coil MC & FC

Coil Access
Panel

Suction Line
Connection

Liquid Line
Connection

Alternate Drain Location

Label
Location

Drain Location
Horizontal Application
(on MC Coils Only)

Primary Drain

Secondary Drain

Bottom Door Panel

 FIGURE 2:  

Component Location - Coil PC

Label Location

Coil Access
Panel

Primary Drain

Secondary Drain

Bottom Door Panel

Alternate Drain Locations

Suction Line
Connection

Liquid Line

Connection

TABLE 1: 

Dimensions - MC Coils

Models

Dimensions

 1

1. All dimensions are in inches.

Refrigerant 

Connections 

2

2. Refrigerant line sizes may require larger lines for extended line lengths. See York bulletin #690.01-AD1V for details.

Height

Width

Opening Widths

Line Size

A

B

C

D

Liquid

Vapor

MC18A

22    

14 1/2

13 3/8

13 1/2

 3/8

 3/4

MC18B

22    

17 1/2

16 3/8

16 1/2

MC24A

26 1/2

14 1/2

13 3/8

13 1/2

MC24B

26 1/2

17 1/2

16 3/8

16 1/2

MC30A

26 1/2

14 1/2

13 3/8

13 1/2

MC30B

26 1/2

17 1/2

16 3/8

16 1/2

MC32A

22    

14 1/2

13 3/8

13 1/2

MC35B

22    

17 1/2

16 3/8

16 1/2

MC35C

22    

21    

19 7/8

20    

MC36A

26 1/2

14 1/2

13 3/8

13 1/2

7/8

MC36B

26 1/2

17 1/2

16 3/8

16 1/2

MC36C

26 1/2

21    

19 7/8

20    

MC37A

26 1/2

14 1/2

13 3/8

13 1/2

3/4

MC42B

32    

17 1/2

16 3/8

16 1/2

7/8

MC42C

32    

21    

19 7/8

20    

MC43B

26 1/2

17 1/2

16 3/8

16 1/2

MC43C

26 1/2

21    

19 7/8

20    

MC48C

32    

21    

19 7/8

20    

MC48D

32    

24 1/2

23 3/8

23 1/2

MC60D

32    

24 1/2

23 3/8

23 1/2

MC62D

36    

24 1/2

23 3/8

23 1/2

20

3/8”

(Opening)

B

C

3/4” Flange

A

21 1/2”

BOTTOM
OPENING
DIMENSIONS

D

20 1/4”

Содержание MC

Страница 1: ...hazardous situation which if not avoided will result in death or serious injury WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION...

Страница 2: ...MC Coils Only Primary Drain Secondary Drain Bottom Door Panel FIGURE 2 Component Location Coil PC Label Location Coil Access Panel Primary Drain Secondary Drain Bottom Door Panel Alternate Drain Locat...

Страница 3: ...See York bulletin 690 01 AD1V for details 20 3 8 Opening B C 3 4 Flange A 21 1 2 BOTTOM OPENING DIMENSIONS D 20 1 4 TABLE 3 Dimensions PC Coils Models Dimensions 1 Refrigerant Connections 2 Height Wid...

Страница 4: ...0 1350 42 3 1050 1350 3 1 2 1225 1575 43 3 1050 1350 3 1 2 1225 1575 48 3 1050 1350 3 1 2 1225 1575 4 1400 1800 60 62 64 4 1600 1800 5 1750 2250 For models that have factory installed TXV s take cauti...

Страница 5: ...ns and Condensate Drain Connections One mounting plate is provided with the coils COIL FLANGE FOR DOWNFLOW AND HORIZONTAL LEFT KIT INSTALLATION The coils include removable flanges to allow proper fit...

Страница 6: ...handled in one of several ways best suited to the installation Upflow horizontal or downflow applications may be used The vast majority of problems encountered with combination heating and cooling sys...

Страница 7: ...n it should be piped to a loca tion that will give the occupant a visual warning that the primary drain is clogged If the secondary drain is not used it must be capped DO NOT use TeflonTM tape pipe do...

Страница 8: ...il using a portable manometer and static pressure tips To prepare coil for static pressure drop measurements the system should have been recently operational in cooling mode Drill 2 holes one 3 after...

Страница 9: ...TXV Bulb positioned correctly Is Bulb Insulated Is Equalizer Line connected FIGURE 16 Drain Traps Secondary Primary 3 Min Were the primary and secondary drains trapped correctly FIGURE 17 Location of...

Страница 10: ...change without notice Published in U S A 841890 UIM B 0612 Copyright 2012 by Johnson Controls Inc All rights reserved Supersedes 841890 UIM A 0412 York International Corp 5005 York Drive Norman OK 73...

Отзывы: