JOHNSON CONTROLS
18
FORM 100.50-NOM7 (808)
Unit Sequence of Operation
COMPRESSOR AVERAGE RUN TIMES
To increase system reliability, all compressors will be
staged up (ON) based on average run time. The com-
pressors with the shortest average run time will always
be energized first in an attempt to equalize run time.
SUPPLY FAN OPERATION
Minimum Off Time
The Supply Fan minimum OFF time is as specified in
Table 2 under section on Timeouts and Delays.
The Supply Fan will be ON prior to:
• Starting any compressors.
• Turning ON any gas or electric heating stage.
• Opening any heating valve.
Overrun
The Supply Fan will continue to run for 1 minute af-
ter all compressors or heating stages turn OFF unless
otherwise stated. When in Thermostat operation, the
overrun requirement will override the loss of the G input
from the Thermostat.
For gas or electric heat, the Supply Fan will continue
to run until the SAT is less than 100°F.
CV Operation
For CV operation:
• The Supply Fan will be ON whenever the G input
from the Thermostat is present.
• The Supply Fan will stay ON when the G input is no
longer present to satisfy the Overrun requirement.
• In Space Sensor, or the Supply Fan will be ON
whenever:
• Heating or cooling is called for.
• the
Fan On with Sensor
parameter is ON and
occupancy is indicated.
VAV Operation
For VAV operation:
• The Supply Fan will be ON at the specified output
level whenever occupancy is indicated.
• When occupancy is not indicated the Supply Fan
will be ON at the specified output level when
-
ever:
• unoccupied cooling or heating is called for.
• the Thermostat G input is present and the
VAV with Thermostat
parameter is ON.
• In the Heating Mode, the Supply Fan will be at
100% output when ON.
• In the Cooling Mode, the Supply Fan will be op-
erated to maintain the
Duct Static Pressure
setpoint
when ON.
Содержание J Series
Страница 85: ...FORM 100 50 NOM7 808 85 JOHNSON CONTROLS 6 ELECTRICAL NOTES AND LEGEND LD13862 ...
Страница 86: ...JOHNSON CONTROLS 86 FORM 100 50 NOM7 808 Service LD13863 CONNECTION DIAGRAM 25 40 TON CV VAV IGV ...
Страница 87: ...FORM 100 50 NOM7 808 87 JOHNSON CONTROLS 6 LD13864 ...
Страница 88: ...JOHNSON CONTROLS 88 FORM 100 50 NOM7 808 Service OPTI CONVERSION TO 25 40 TON LD13854 ...
Страница 89: ...FORM 100 50 NOM7 808 89 JOHNSON CONTROLS 6 LD13865 ELEMENTARY DIAGRAM ALL UNITS ...
Страница 90: ...JOHNSON CONTROLS 90 FORM 100 50 NOM7 808 Service LD13860 ELEMENTARY DIAGRAM GAS HEAT 25 40 TON 230V ...
Страница 91: ...FORM 100 50 NOM7 808 91 JOHNSON CONTROLS 6 ELEMENTARY DIAGRAM GAS HEAT 25 40 TON 575V LD13861 ...