LIMIT CONTROLS

There is high temperature limit control located on the furnace vestibule
panel near the gas valve. This is an automatic reset control that pro-
vides over-temperature protection due to reduced airflow. This may be
caused by 

1.

dirty filter,

2.

if the indoor fan motor should fail, or

3.

Too many supply or return registers closed or blocked off.

The control module will lockout if the limit trips 5 consecutive times
within a single call for heat. Control will reset and try ignition again after
1 hour.

SECTION X: START-UP AND 

ADJUSTMENTS

The initial start-up of the furnace requires the following additional
procedures:

IMPORTANT: 

All electrical connections made in the field and in the fac-

tory should be checked for proper tightness.

When the gas supply is initially connected to the furnace, the gas piping
may be full of air. In order to purge this air, it is recommended that the
ground union be loosened until the odor of gas is detected. When gas is
detected, immediately retighten the union and check for leaks. Allow
five minutes for any gas to dissipate before continuing with the start-up
procedure. Be sure proper ventilation is available to dilute and carry
away any vented gas.

TOOLS AND INFORMATION THAT WILL BE 

REQUIRED IN ORDER TO PROPERLY PERFORM THE 

FURNACE STARTUP PROCEDURE.

1.

Call the local gas supplier to obtain heating value of the natural
gas. If you cannot obtain the heating valve of the gas from the gas
supplier, you may use a default value of 1030 BTU/SCF (38.8 MJ /
m³). 

2.

You will need a thermometer or portable digital thermometer to
read the supply and return air temperatures. 

3.

You will need a U-tube manometer or digital equipment that has
the ability to read pressures between 0 – 15” in.w.c (0 - 3.73 kPa)
in order to measure the gas line and the manifold pressures. 

4.

You will need a 3/32” Allen wrench for the pressure port plugs in
the gas valve. 

5.

You will need 2 pieces of 1/8” (0.3 cm) ID flexible tubing that is 12”
(30 cm) in length, 2 – pieces of 1/8” (0.3 cm) tubing that are 4”
(10.0 cm) in length, a 1/8” (0.3 cm) tee and a 1/8” (0.3 cm) adapter
to connect the U-tube manometer or the digital pressure measur-
ing equipment to the gas valve pressure ports.

There is an accessory kit (1PK0601) available from Source 1, which
has the following items:

1 - 12” (30 cm) length x 1/8” (0.3 cm) diameter tubing

2 – pieces of 4” (10 cm) length x 1/8” (0.3 cm) diameter tubing

1 - 5/16” (0.8 cm) tee

1 – 5/16” (0.8 cm) x 1/8” (3.175 mm) reducing coupling

1 – 1/8” (0.3 cm) adapter

There is a accessory kit (1PK0602) available from Source 1, which has
the following items:

12” (30 cm) length x 1/8” (0.3 cm) diameter tubing

2 – pieces of 4” (10 cm) length x 1/8” (0.3 cm) diameter tubing

1 - 5/16” (0.8 cm) tee

1 – 5/16” (0.8 cm) x 1/8” (0.3 cm) reducing coupling

1 – 1/8” (0.3 cm) adapter

1 - Dwyer – Manometer

These items are required in order to properly perform the required star-
tup procedure.

IGNITION SYSTEM SEQUENCE

1.

Turn the gas supply ON at external valve and main gas valve.

2.

Set the thermostat above room temperature to call for heat.

3.

System start-up will occur as follows:

a.

The induced draft blower motor will start and come up to
speed. Shortly after inducer start-up, the hot surface igniter
will glow for about 17 seconds.

b.

After this warm up, the ignition module will energize (open)
the main gas valve.

c.

After flame is established, the supply air blower will start in
about 30 seconds.

IMPORTANT: 

Burner ignition may not be satisfactory on first startup

due to residual air in the gas line or until gas manifold pressure is
adjusted. The ignition control will make 3 attempts to light before lock-
ing out.

With furnace in operation, check all of the pipe joints, gas valve connec-
tions and manual valve connections for leakage using an approved gas
detector, a non-corrosive leak detection fluid, or other leak detection
methods. Take appropriate steps to stop any leak. If a leak persists,
replace the component.

The furnace and its equipment shutoff valve must be disconnected from
the gas supply piping system during any pressure testing of that system
at test pressures in excess of 1/2 PSI (3.45 kPa).

The furnace must be isolated from the gas supply piping system by
closing the equipment shutoff valve during any pressure testing of the
gas supply piping system.

CALCULATING THE FURNACE INPUT 

(NATURAL GAS)

NOTE: 

Burner orifices are sized to provide proper input rate using natu-

ral gas with a heating value of 1030 BTU/Ft

3

 (38.4 MJ/m

3

). If the

heating value of your gas is significantly different, it may be nec-
essary to replace the orifices.

NOTE: 

Front door of burner box must be secured when checking gas

input. 

1.

Turn off all other gas appliances connected to the gas meter.

2.

At the gas meter, measure the time (with a stop watch) it takes to

use 2 cubic ft. (0.0566 m

3

.) of gas.

3.

Calculate the furnace input by using one of the following equa-
tions.

 FIGURE 24:  

Pressure Switch Tube Routing

Perform the following procedures only after the condensate trap
has been properly piped to a drain connection using the procedure
in this instruction.

FIRE OR EXPLOSION HAZARD
Failure to follow the safety warnings exactly could result in serious
injury, death or property damage.
Never test for gas leaks with an open flame. Use a commercially
available soap solution made specifically for the detection of leaks
to check all connections. A fire or explosion may result causing
property damage, personal injury or loss of life.

Содержание FC9S

Страница 1: ...8 TWINNING AND STAGING 9 COMBUSTION AIR AND VENT SYSTEM 11 CONDENSATE PIPING 18 SAFETY CONTROLS 18 START UP AND ADJUSTMENTS 19 WIRING DIAGRAM 25 LIST OF FIGURES Dimensions 5 Furnace Base Rectangular Blockoff Panel 6 Gas Valve 6 Gas Piping 6 Electrical Wiring 8 Line Wiring Connections 9 Single Stage Heat Thermostat Connections 9 Single Stage Heating and Two Stage Cooling Thermostat Connections 9 Ac...

Страница 2: ...e ational vehicles Failure to carefully read and follow all instructions in this manual can result in furnace malfunction death personal injury and or property damage Furnaces for installation on combustible flooring shall not be installed directly on carpeting tile or other combustible material other than wood flooring Check the rating plate and power supply to be sure that the elec trical charac...

Страница 3: ... required for passage to the front when servicing or for inspection or replacement of flue vent connections In all cases accessibility clearances shall take precedence over clear ances for combustible materials where accessibility clearances are greater Installation in a residential garage 1 A gas fired furnace for installation in a residential garage must be installed so the burner s and the igni...

Страница 4: ...ssure drop across any applied coil TABLES 2 AND 3 are to be used as a guide only to help the installer determine if the duct sizes are large enough to obtain the proper air flow CFM through the furnace TABLES 2 and 3 ARE NOT to be used to design ductwork for the building where the furnace is being installed There are several variables associated with proper duct sizing that are not included in the...

Страница 5: ... 1 for unit and plenum dimensions Attic installations must meet all minimum clearances to combustibles and have floor support with required service accessibility The supply air temperature MUST NEVER exceed the Maximum Supply Air Temperature specified on the nameplate Operating the furnace above the maximum supply air temperature will cause the heat exchanger to overheat causing premature heat exc...

Страница 6: ...uctions in this section specify the type of gas approved for this furnace only use those approved gases The instal lation of a drip leg and ground union is required Refer to Figure 4 IMPORTANT An accessible manual shutoff valve must be installed upstream of the furnace gas controls and within 6 feet 1 8 m of the fur nace The furnace must be isolated from the gas supply piping system by closing its...

Страница 7: ...cing a wrench to the body of the gas valve will damage the valve causing improper operation and or the valve to leak TABLE 5 High Altitude Conversion 40 120 MBTUH Models Type Of Gas Orifice at Sea Level 2 000 ft 610 m 3 000 ft 914 m 4 000 ft 1219 m Natural 45 46 47 47 Propane 55 55 55 55 Type Of Gas 5 000 ft 1524 m 6 000 ft 1829 m 7 000 ft 2134 m 8 000 ft 2438 m Natural 47 48 48 49 Propane 56 56 5...

Страница 8: ...ternate wiring method is to use a field provided 2 5 08 cm x 4 10 2 cm box and cover on the outside of the furnace Route the furnace leads into the box using a protective bushing where the wires pass through the furnace panel After making the wiring connections replace the wiring box cover and screws 3 The furnace s control system requires correct polarity of the power supply and a proper ground c...

Страница 9: ... using the same duct system it is very important that the two furnace cir culating air blowers operate in unison If one blower starts before the second blower the duct system will become pressurized and the blower on the second furnace will turn backwards causing the second furnace to overheat resulting in damage to the furnace Twinning is used to make two furnaces operate in tandem using one duct...

Страница 10: ... then will shut off at the same time Continuous Fan On a thermostat call for continuous fan G signal both furnace blowers will come on at the same time in cooling speed and will stay on until the G signal is removed STAGING In applications where more heating capacity or more airflow capacity is needed than what one furnace can deliver twinning can be used to make two furnaces operate in tandem usi...

Страница 11: ...low a maximum of 5 elbows in the combustion air piping and a maximum of 5 elbows in the vent piping 4 Three vent terminal elbows two for vent pipe and one for air intake pipe are already accounted for as vent termination 5 Combustion air and vent piping must be of the same diameter 6 All combustion air vent pipe and fittings must conform to American National Standards Institute ANSI standards and ...

Страница 12: ...on air systems from the furnace to the out side termination B Ventilated combustion air systems from the furnace to the attic or crawl space termination 6 Disassemble the combustion air and vent piping apply cement primer and the cement per the manufactures instructions Primer and cement must conform to ASTM D2564 for PVC or ASTM D2235 for ABS piping 7 All joints must provide a permanent airtight ...

Страница 13: ...30 kW 36 inches 91 cm for models 100 000 BTUH 30 kW Two pipe direct vent applications 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW Single pipe applications 4 feet C Clearance to permanently closed window 4 Feet 4 Feet D Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 feet 61 cm from the center line of ...

Страница 14: ...combustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 15 or 16 VENTING MULTIPLE UNITS Multiple units can be installed in a space or structure as either a single pipe configuration or a two pipe configuration The combustion air side of the single pipe configuration shown in Figure 20 is referred to in these instruct...

Страница 15: ...ill bring air in from the outdoors to the furnace combustion air intake collar on the burner box The second pipe Shown in Figure 19 is the furnace vent pipe The combustion air intake pipe should be located either through the wall horizontal or side vent or through the roof vertical vent Care should be taken to locate side vented systems where trees or shrubs will not block or restrict supply air f...

Страница 16: ...he louver is in the fully open position This type of installation requires that the supply air to the appli ance s be of a sufficient amount to support all of the appliance s in the area Operation of a mechanical exhaust such as an exhaust fan kitchen ventilation system clothes dryer or fireplace may cre ate conditions requiring special attention to avoid unsatisfactory operation of gas appliances...

Страница 17: ...usage Follow all notes procedures and required materials in the SEALED COMBUS TION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a ventilated attic space or crawl space DO NOT terminate vent pipe in an Attic or Crawl Space Ventilated Combustion Air Termination Refer to Figure 22 for required attic termination for the combustion air intake p...

Страница 18: ...p pump must be approved for use with acidic condensate CONDENSATE DRAIN TRAP AND DRAIN FREEZE PROTECTION Special precautions MUST be made if installing furnace in an area which may drop below freezing This can cause improper operation or damage to the equipment If the furnace is installed in an area that has the potential of freezing the drain line and the drain trap must be pro tected Use a 3 to ...

Страница 19: ...gth x 1 8 0 3 cm diameter tubing 2 pieces of 4 10 cm length x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 0 3 cm reducing coupling 1 1 8 0 3 cm adapter 1 Dwyer Manometer These items are required in order to properly perform the required star tup procedure IGNITION SYSTEM SEQUENCE 1 Turn the gas supply ON at external valve and main gas valve 2 Set the thermostat above room temp...

Страница 20: ...s 3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the gas meter times a baro metric pressure and temperature correction factor of 0 960 times 3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter The formula for metric input...

Страница 21: ...ll reference atmo spheric pressure Refer to Figure 26 for connection details IMPORTANT The cap for the pressure regulator must be removed entirely to gain access to the adjustment screw Loosening or tightening the cap does not adjust the flow of gas 1 Refer to Figure 25 for location of pressure regulator adjustment cap and adjustment screw on main gas valve 2 Turn gas and electrical supplies on an...

Страница 22: ...ws user selection of the blower speed that is energized during continuous fan operation Place jumper on the HI COOL LO COOL or HEAT pins The blower speed connections shown in Figure 27 are typical How ever these connections may vary from model to model and may be changed as needed to give proper heating and cooling airflow WITH BURNER BOX COVER IN PLACE WITH BURNER BOX COVER REMOVED FIGURE 26 Read...

Страница 23: ... 35 1175 33 1105 31 1045 30 990 28 905 25 890 25 790 22 80 1600 C 100 1600 C HIGH 1960 56 1955 55 1925 55 1890 54 1830 52 1765 50 1695 48 1615 46 1600 45 1485 42 M HI 1565 44 1560 44 1560 44 1575 45 1545 44 1530 43 1475 42 1425 40 1365 39 1260 36 M LO 1230 35 1275 36 1285 36 1300 37 1310 37 1300 37 1280 36 1245 35 1190 34 1070 30 LOW 930 26 945 27 965 27 975 28 975 28 975 28 975 28 950 27 910 26 8...

Страница 24: ... that total system static is 0 58 w c To determine the system airflow complete the follow ing steps Obtain the airflow values at 0 50 w c 125 Pa 0 60 w c 150 Pa ESP Airflow 0 50 2285 CFM 64 70 m3 min Airflow 0 60 2175 CFM 61 59 m3 min Subtract the airflow 0 50 w c 125 Pa from the airflow 0 60 w c 150 Pa to obtain airflow difference 2175 2285 110 CFM 3 11 m3 min Subtract the total system static fro...

Страница 25: ...105564 UIM A 0205 Unitary Products Group 25 SECTION XI WIRING DIAGRAM FIGURE 28 Wiring Diagram ...

Страница 26: ...105564 UIM A 0205 26 Unitary Products Group NOTES ...

Страница 27: ...105564 UIM A 0205 Unitary Products Group 27 NOTES ...

Страница 28: ...o change without notice Printed in U S A 105564 UIM A 0205 Copyright by York International Corp 2005 All rights reserved Supersedes 035 20377 002 Rev A 0904 Unitary 5005 Norman Product York OK Group Drive 73069 ...

Отзывы: