20
GB
After installation test and
check operations
Test operation
(Fig. 19)
1. Prior to test:
(1) Do not connect the unit until com-
pletely installed.
(2) Wiring should be correct and safe.
(3) Valves should be open.
(4) The unit should be free of impurities.
2. Test operation method:
(1) Connect the unit and press ON/OFF
button on the remote control unit.
(2) Press the MODE button to make sure
all three modes are operative:
COOL, HEAT, DEHUMIDIFICATION.
3. Emergency method.
Whenever the remote control unit cannot
be used, proceed as follows:
* With the unit off, press AUTO to
activate. The unit will operate in the
corresponding mode.
* With the unit on, press AUTO to turn
it off.
Note:
The TEST mode is for testing pur-
poses only. Do not use as a regular operat-
ing mode.
Fig. 19
Data and dimensions are subject to change without prior notice.
Содержание EKKC-18 DS
Страница 2: ......
Страница 64: ...www johnsoncontrols com...