<3.  Maintenance>

14

IM 01F07A01-02EN

3.5  Removing and Installing the Shedder Bar

IMPORTANT

•   The accuracy is not guaranteed after removing and replacing the shedder bar.

  If you require an accuracy guarantee, we recommend having the Yokogawa factory perform 

shedder bar removal and replacement.

•   Shedder bar replacement should be performed by trained personnel with knowledge of the 

product characteristics and safety.

WARNING

•   In the case of an explosion protected type instrument, make sure that no explosive 

atmosphere conditions are present.

•   Before removing the shedder bar, stop the flow and remove any remaining fluid.

•   When removing or installing the shedder bar, pay careful attention to the handling of the 

transmitter case O-rings and shedder bar O-rings to prevent damage and adhesion of foreign 

matter.

•   Replace O-rings if they are damaged or deformed.

•   If there is no lubricant on the O-rings, apply silicone-based grease.

•   When replacing or removing the shedder bar, always replace the gasket with a new one.

CAUTION

If the shedder bar is not properly reinstalled after replacing or removing it, the readings may be 

affected when operation resumes.

Содержание VY Series

Страница 1: ...User s Manual Vortex Flowmeter VY Series Maintenance Manual IM 01F07A01 02EN IM 01F07A01 02EN 1st Edition...

Страница 2: ...rage Precautions 8 3 MAINTENANCE 9 3 1 Changing the Orientation of the Transmitter Case and Sensor Terminal Box 9 3 2 Removing and Rotating the Indicator 10 3 3 Removing the Amplifier Unit 12 3 4 Inst...

Страница 3: ...those for the standard type under the specified model number break down and do not cover custom made instruments Please note that this manual may not be revised for any specification changes construc...

Страница 4: ...follows Functional ground terminal Direct current Handling precaution This is attached to locations where this manual must be referenced to protect personnel safety and devices When handling this ins...

Страница 5: ...in accordance with local and national legislation regulations Table 1 1 Related Documents Document title Document No Vortex Flowmeter VY Series GS 01F07A00 01EN FSA130 Magnetic Flowmeter Vortex Flowm...

Страница 6: ...ctronic components by for example wearing wrist straps to prevent charging by static electricity and not directly touching electronic components circuits and other components susceptible to static ele...

Страница 7: ...resulting from handling operation or storage that violates the intended use and specifications Problems that result from using or performing maintenance on the instrument in a location that does not c...

Страница 8: ...ected thoroughly before it is shipped from the factory When this instrument is delivered to the installation site check its external appearance for damage and make sure that all parts for installation...

Страница 9: ...ould be as follows The preferred ambient temperature and humidity levels are 25 C and approximately 65 RH Ambient temperature 40 to 85 C Humidity 0 to 100 RH no condensation 3 When storing a vortex fl...

Страница 10: ...ormed at the Yokogawa factory The orientation of the transmitter case and sensor terminal box can be changed in 90 degree increments four directions Follow the procedure below to change the orientatio...

Страница 11: ...nd adhesion of foreign matter Replace O rings if they are damaged or deformed If there is no lubricant on the O rings apply silicone based grease CAUTION In the case of an explosion protected type ins...

Страница 12: ...htening the screws and washers 6 When installing the indicator perform the removal procedure in reverse to return the parts to their original positions then tighten the indicator mounting screws The i...

Страница 13: ...oreign matter Replace O rings if they are damaged or deformed If there is no lubricant on the O rings apply silicone based grease Follow the procedure below to remove the amplifier unit 1 Turn the pow...

Страница 14: ...amplifier unit mounting guide pins into the mounting holes 3 Lightly press the upper and lower parts of the amplifier unit simultaneously to insert the amplifier unit into the transmitter case Take c...

Страница 15: ...ent make sure that no explosive atmosphere conditions are present Before removing the shedder bar stop the flow and remove any remaining fluid When removing or installing the shedder bar pay careful a...

Страница 16: ...tention to the sensor cable 3 Remove the shedder bar mounting bolts 2 to 10 bolts and washers then remove the shedder bar fixing block and shedder bar with attention to the sensor cable The instrument...

Страница 17: ...Table 3 2 Partially tighten each bolt equally 3 to 4 times until the tightening torque value is reached Read Figure 3 8 for the bolt tightening sequence F1105 ai Upstream Number of bolts 2 Number of...

Страница 18: ...49 3 74 3 49 3 VY150 0 VY200 1 69 98 69 VY200 0 69 98 69 VY250 0 157 210 140 VY300 0 157 210 140 VY400 0 160 240 140 1 For SPG stainless steel gasket plated with silver only 2 For ASME JPI Class 150...

Страница 19: ...e Flow velocity V V N 1 t 1 KT UKT 4 D2 f Reynolds number Re Re V D f 1 1000 N Number of input pulses pulse t Time corresponding to N sec f Instrument error correction coefficient e Compressible fluid...

Страница 20: ...low rate Uk Uk m3 For M mass Uk f U f Uk kg d For user specified units Uk Uk User 3 Mass flow rate calculation for instruments with built in temperature sensor and analog input a Steam In the case of...

Страница 21: ...2 T1 T2 2 T2 T1 2 10 2 a2 k1 1 T2 k2 1 T1 T1 2 T2 T2 2 T1 10 6 kx 1 a1 Tx 10 2 a2 Tx 2 10 6 Tx Tx Tn x 1 2 M Mass flow rate Qn Volumetric flow rate at normal conditions Qf Volumetric flow rate at ope...

Страница 22: ...21 IM 01F07A01 02EN Revision Information Title Vortex Flowmeter VY Series Maintenance Manual Edition Date Page Revised Item 1st Feb 2022 New publication...

Отзывы: