<3. INSTALLATION, PIPING AND WIRING>
3-4
IM 12T03A01-02E
Anchor bolt
Drain pit
Concrete base
Density meter sampling unit
Figure 3.6
Installation Example for Sampling Unit (Model VD6SM)
(2) Note of Designing a Density Meter Sampling Unit
• Minimize liquid pipe length to improve response.
• Design the piping not to allow air bubbles to remain in the pipe which may cause an error.
• Piping should not have sharp bending where solids may accumulate.
• Maintenance such as cleaning should be made easily.
• Select element material most suitable for measuring liquid. Especially, for foodstuff
measurement, the selection should be done strictly.
(3) Installation of a Density Meter Sampling Unit
For the density detector with the sampling unit or with the sampling equipment user provided,
installing place must
• be near to sample tap on the main pipe.
• be free from vibration
• meet the ambient conditions specified by the hazardous area (when the detector is model
VD6DF flameproof type).
Moreover, the sampling unit should be fixed to a concrete base drained well.
(4) Removing a Packing Sheet for Transportation from the Density Detector
The vibrator is fixed to the amplifier case to avoid being damaged during transportation.
Remove the rubber sheet used for the fixing. The rubber sheet is inserted between the case
and the coupler of the vibrator assembly. Remove the sheet according the steps below. For
component names, refer to the section 4.1.1.
(a) Remove the lock with a hexagonal bar wrench. Release the cover by turning it
counterclockwise and pull it down not to touch the internal assembly.
(b) Remove the cover (with desiccant) from the vibrator.
5th Edition : Dec. 11, 2015-00
Содержание vigilantplant DM8
Страница 1: ...User s Manual R Model DM8 Vibration Type Density Meter IM 12T03A01 02E IM 12T03A01 02E 5th Edition ...
Страница 5: ...Blank Page ...
Страница 9: ...Blank Page ...
Страница 25: ...Blank Page ...
Страница 41: ...Blank Page ...
Страница 57: ...Blank Page ...
Страница 63: ...Blank Page ...