YMGI • Your Modern Green Idea
YMGI, Engineered Comfort Products for A Sustainable and Efficient Green World!
22
HANGING PREPARATIONS
Firmly fasten the hanging bolts as shown in Fig.4 or by another method
HANGING PREPARATIONS
1) Install special nut A then special nut B onto the hanging
bolt. (Fig.6)
2) Raise the body and mount its hooks onto the hanging
bolt between the special nuts. (Fig.6)
3) Turn special nut B to adjust the height of the body.
(Fig.6)
4) Use a level, or vinyl hose filled with water, to adjust the
unit to level.
Tighten the bolts to a secure position
INSTALLING DRAIN PIPE
Install the drain pipe with a downward gradient (1/50 to 1/100) so there are no rises or traps in the pipe.
Use general hard polyvinyl chloride pipe (VP25) (outside diameter 1-1/4") and connect it with adhesive (polyvinyl
chloride) so that there is no leakage.
When the pipe is long, install supporters.
Always heat insulate the indoor side of the drain pipe.
When desiring a high drain pipe height, raise it up to 15" or less from the ceiling within a range of 6" from the body.
Arise dimension over this range will cause leakage.