35
5. INSTALLATION OF THE MACHINE
5.1 Preparation
5.1.1 The machine size and weight measurements, given the technical specification sheet.The ground, where the
machine will be placed, should be even, solid enough to bear the weight of the machine
5.1.2 The machine should be located approx. 100 cm away from the rear wall
5.1.3 You can provide the balance of the machine with adjustable counterforts (PICTURE 3 NO 90) in the bottom
part.
5.1.4 Fasten MKN 300 material supply conveyor given as Standard accesory onto the cutting unit to the right side
surface of the machine as seen in the Figure 8 by using the screws on the machine. Provide the conveyor
bobbins and machine top surface to be the same parallelism by using a sensitive and calibrated water gauge.
5.1.5 To use shaving manifolde, the absorbtion flowrate of air for dry chips has to be thought min.20m/sec. 28 m/sec
absobtion flowrate of air wet chips (>=%18 humidity) can be decided to operate the manifolde
5.2 Connecting to Power Source
5.2.1
The Electrical connection must be made by a licensed electrician
5.2.2
The power outlet socket on the machine should be available.
5.2.3
Plug the machine to a grounded socket.
5.2.4
Main voltage of the machine is optional as 230 V 50 Hz or 400 V 50 Hz.
5.2.5
Check
the power source voltage. It has to be in accordance with the values stipulated on the machine’s
type label
Содержание ACK 420
Страница 4: ...4 BOYUTLAR DIMENSIONS РАЗМЕРЫ RESİM FIGURE РИСУНОК 1 ...
Страница 5: ...5 KESME DİYAGRAMI CUTTING DIAGRAM ДИАГРАММА РЕЗКИ ...
Страница 6: ...6 PARÇA LİSTESİ PART LIST ПЕРЕЧЕНЬ ДЕТАЛЕЙ RESİM FIGURE РИСУНОК 2 RESİM FIGURE РИСУНОК 3 ...
Страница 7: ...7 RESİM FIGURE РИСУНОК 4 RESİM FIGURE РИСУНОК 5 ...
Страница 8: ...8 RESİM FIGURE РИСУНОК 6 ...
Страница 9: ...9 RESİM FIGURE РИСУНОК 8 RESİM FIGURE РИСУНОК 7 RESİM FIGURE РИСУНОК 9 ...