background image

IX. The do’s and don’ts

1.    DO NOT install/De-install Nozzles with excessive force. DO NOT use pliers to 
       pull the nozzle edge out, DO NOT tight the nozzle’s bolt exessively.
2.    Only install nozzles when the unit is cool(room temperature)
3.    DO NOT use unit near flammable gas or liquid or any combustible material 
       WHATSOEVER especially when using the unit in high-temperature operation.
       DO NOT face the hot air outlet or touch the soldering Iron to the human body 
       WHATSOEVER because it is very hot and can instantly burn the skin/body. 
       When the first use the unit might emit white smoke. But this soon will go away.
4.    Replacement heater, be carful not to damage the grounding line!
5.    Replacement the cable should pay attention to the order and color, can not be 
       wrong.
6.    Please replace the same model heater. 
       
       

9

10

X. Interchangeable component description

Replacement of Hot Air rework heating element(Figure 4)

1.    Ensure the Hot Rework is fully cooled down before replacing the element.
2.    As Figure, loosen the two screws on the handle.
3.    Turns the handle antic-clockwise until it comes off and then remove the handle’s 
       cover.
4.    Gently takes out the fan, loosen the three screws to remove the fixed wiring board.
5.    The wiring board vice versa, apart from the heater wiring board connection cable, 
       pay attention to the connection location.
6.    Remove from the heat pipe heat body with mica paper, careful not broken ground 
       wire of the steel.
7.    Wraps well with the new heater mica, inserted into the tube, the attention heater to 
       install in place.
8.    According to the original location of the connection to connect heater.
9.    When the revers process by open bottles and handle back.

Replacement of the soldering iron’s tip and soldering iron heating core’s 
element(Figure5)

1.    Unscrews the nut NO.1,and then removes the steel tube NO.2, followed by 
       removing the tip which is going to be replaced.

2.    For the replacemnet of heating core’s element can be performed by unscrewing 
       the plastic cap NO.4,pulls out gently the heating core’s element NO.6 along with 
       the circuit board NO.7, please carefully remember the connection of spring 
       NO.5.
3.    The iron core from the circuit board welding, the replacement of the heating 
       core, can be fitted well.Note that the order of the iron corewire connection.

1.    Remove the topo cover1.
2.    Unscrew the screws2.
3.    Remove the warm-up bracket.
4.    Pull out the clamp.
5.    Remove the preheated plate.

Replacement of the preheating plate(Figure6)

Содержание 853A

Страница 1: ...e read the User Guide thoroughly before use and keep it in a safe place for future reference Preheating station Hot air reworks soldering station combination Statement The company reserves the right to improve and upgrade products product specifica tions and design are subject to change without notice English INSTRUCTION MANUAL ...

Страница 2: ...et proper ventilation 15 After use remember to cooling the fuselage WARNING I General Usage 1 Suitable for de soldering and soldering BGA SOIC CHIP QFP PLCC packa ge SMD IC particularly suitable for de soldering BGA module computer mo ther board north and south bridge all kind of mobile phone motherboard SMT IC and LED lights 2 Shrinking paint drying adhesive removal thawing warming plastic weldin...

Страница 3: ...nction Meet different market needs to design the temperature display mod you can choose under customary interest 3 4 III Specification Voltage Weight Power 853A 853AA 853AAA AC 220V 5 AC 220V 5 AC 220V 5 500W 1200W 1270W 3 0kg 0 40 C 32 104 F 20 80 C 4 176 F 35 45 Model Work environment Storage environment Store humidity Size L320xW220xH100mm 5mm L250xW220xH90mm 5mm 4 5kg 5 6kg 50 300 C or 50 400 C...

Страница 4: ...air gun heating body the power to enter the cooling heating element mode When the temperature is below 100 C the air gun display window goes off and stop the wind Hot air reworks part 853AA 853AAA 853AAA Remove the components 1 The successful rework first removal location of the fault on mother board and the solder is heated to the melting point and then carefully scored the compo nents from the b...

Страница 5: ...soldering iron handle adopt high strength stainless steel tube the machine must be inspected or calibrated four times in normal working condition during the production process the copper tube could be slight yellowing due to high temperature When use the new machine first time it is normal that the steel tube at tube at a slight yellowing please be assured Special Instructions VIII Description For...

Страница 6: ...ently takes out the fan loosen the three screws to remove the fixed wiring board 5 The wiring board vice versa apart from the heater wiring board connection cable pay attention to the connection location 6 Remove from the heat pipe heat body with mica paper careful not broken ground wire of the steel 7 Wraps well with the new heater mica inserted into the tube the attention heater to install in pl...

Страница 7: ...epaired enjoy replacement service 2 From purchasing date within one year under normal use if there are quality problem not be disassemble and repaired enjoy free repair service 3 For more than warranty we provide a lifetime warranty service free of labor costs charge only spare parts costs 4 Failure to present warranty card during warranty period the company will not be a free service 5 Users need...

Отзывы: