Call:
+44 (0)1268 570900
Fax:
+44 (0)1268 732509
Email:
Visit:
www.yewdale.co.uk
7
16
.
Now insert the spline and trucks into the profiled channel – 92700W. Slide
the lead trucks down the channel.
17
.
Using the workings below, insert the appropriate tubular spacer part
number 927007W onto the spline on the outside edge of the second stack of
trucks.
18
.
Insert the second control set onto the spline and fix in place using a stop
ring – 927010 and fasten with slotted screwdriver.
19
.
Fix the stop ring on the second stack of trucks with slotted screwdriver.
20
.
Using part number 927016W, cut the wand to the desired length and fix
onto 927015W with the screw provided. (Round off cut end of control wand
with an abrasive material).
21
.
Using the wand, pull trucks back and forth to make sure the trucks run
smoothly.
22
.
Wipe clean the profile and bring all trucks back to the control end ready for
packing.
VL30 89mm single draw
VL30 127mm single draw
Control Idle
Control Idle
1.5
2.5