YewdaleDefiant
®
Manufacturing instructions
Part no: 1002
6
Manufacturing Instructions
YewdaleDefiant
®
vertical blinds (VL31 Split Draw)
12
.
Loading the first stack of trucks onto the spline, with the links facing away
from the stack position, insert a stop ring – 927010, onto the spline between
the first and second truck.
13
.
Sliding all the trucks fully home, against the right-hand end cap, fix the stop
ring in place using a slotted screwdriver to hold the first truck captive.
14
.
Slide one shaft support onto the spline – 927009W.
15
.
Slide the second stack of trucks onto the spline, with the links facing
towards the other stack, whilst inserting a stop ring between the last and
second from last truck.