15
Assembly Instructions
Installation of the Fertilizer Tubes
Below are assembly diagrams for the 4 fertilizer tube kits offered for the 2984 Strip Freshener CC units. An additional clamp on hose is offered for
each of the liquid kits to get the fertilizer closer to the soil profile to help keep the fertilizer in the desired location & keep splatter to a minimum.
When installing the fertilizer delivery hoses, follow the same route as the airlines. Follow the OEM installation instructions on flow rate, orifices, etc.
Содержание CAB CONTROL STRIP FRESHENER 2984-050-R
Страница 18: ...18 OPERATION Cab Control Operation...
Страница 21: ...21 2984 050 STRIP FRESHENER CC PART IDENTIFICATION...
Страница 22: ...22 2984 050 STRIP FRESHENER CC PART IDENTIFICATION...
Страница 23: ...23 2984 132 PARALLEL LINKAGE ASSEMBLY PART IDENTIFICATION...
Страница 24: ...24 NARROW ROW CLEANER ASSEMBLY PART IDENTIFICATION...
Страница 25: ...25 WIDE ROW CLEANER ASSEMBLY PART IDENTIFICATION...
Страница 26: ...26 GAUGE WHEEL ASSEMBLY PARTS IDENTIFICATION SHARKTOOTH MOUNT ASSEMBLY PART IDENTIFICATION...
Страница 27: ...27 ROLLING BASKET ASSEMBLY PART IDENTIFICATION...
Страница 28: ...28 ROW CLEANER MOUNT ASSEMBLY PART IDENTIFICATION DEPTH STOP ADJUST ASSEMBLY PART IDENTIFICATION...
Страница 30: ...30 HUB ASSEMBLY PART IDENTIFICATION SCREW ADJUST ASSEMBLY PART IDENTIFICATION...
Страница 31: ...31 PARTS IDENTIFICATION...
Страница 32: ...32 PARTS IDENTIFICATION...
Страница 34: ...34 NOTES...
Страница 35: ...35...
Страница 36: ...36 2565 968 11 2019...