20.
21.
assembly
make sure your tools are in good condition.
a worn allen key can round the hex on a bolt
not allowing for proper torque.
torque settings are listed throughout the
instructions. it is also import to prep all bolt
threads. the instructions denote whether to
use a blue loctite compound or grease.
yeti tips
tools needed
Warning: service on Yeti bicycles requires special knowledge
and tools. Yeti cycles recommends that all service and
repairs be performed by an authorized Yeti Dealer
• Dead blow hammer
• two - 5mm allen keys
• two - 6mm allen keys
• Guide pin tool
• Grease
• Blue loctite
place the 54mm OD quad o-ring by the drive side
main pivot bearing. the o-ring should be flush
with the bearing. repeat the process with the
60mm OD quad o-ring on the non-drive side of
the main pivot.
lightly grease the 45mm integrated axle and
insert it into the frame through the non-drive side
main pivot bearing.
lightly grease the 40mm integrated axle and
insert it through the drive side main pivot bearing.
ensure the main pivot pin axle hole is aligned with
the axle hole on the non-drive side.
prepare a ti male bolt with blue loctite and install
into the threads on the drive side integrated axle
with a 5mm allen key.
torque to 90-95 in/lb.
01.
02.
03.
04.