![background image](http://html1.mh-extra.com/html/yeastar-technology/n1/n1_installation-manual_3258714004.webp)
N1 Installation Guide
2
1. Preparation before Installation
1.1 Packing List
Upon receiving Yeastar N1 gift box, please open the package and check if all the
items are supplied as N1 Packing List. If there is any problem, please contact your
provider.
Table 1-1 N1 Packing List
Item
Unit
QTY
Description
N1
PC
1
N1 device unit.
Power cord
PC
1
For the input of 220V AC power.
Network cable
PC
1
Mounting ears
PC
2
Screws
PC
8
8 screws (
φ3.0*6 mm) for mounting ears.
Grounding stud & nut
Pair
1
Rubber feet
PC
4
Warranty card
PC
1
With Serial Number printed for Repair &
Return.
Quick Start Guide
PC
1
1.2 Specifications and Operating Environment
Table 1-2 Specifications and Operating Environment
N1
Description
Size (L×W×H)
440 mm ×250 mm ×44 mm
Power Supply
AC 100-240V 50/60Hz
Operating Temperature
0°C to 40°C, 32°F to 104°F
Storage Temperature
-20°C to 65°C, 4°F to 149°F
Humidity
10% to 90% (non-condensing)