![background image](http://html1.mh-extra.com/html/yealink/mvc-2-series/mvc-2-series_deployment-manual_908633049.webp)
| Deployment and Connection |
49
For more information on how to install the MCore, please refer to
Yealink Mcore Quick Start Guide (EN,
.
Conference Room Wiring
If the conference room has a dedicated routing channel, you can follow the way as it is. If not, follow the
way below to route and fix the wire.
Note:
If you require longer cable length for connecting the camera, you can use the USB extension
cables for wiring.
Installing the Content Camera
You can mount the content camera on the wall or suspend it on the ceiling as below:
Содержание MVC 2 Series
Страница 1: ...Yealink MVC MVC Ⅱ Series for Microsoft Teams Rooms System Deployment Guide V2 4 ...
Страница 26: ... Deployment and Connection 26 Deployment and Connection of MVC840 Optional audio device connection ...
Страница 38: ... Deployment and Connection 38 MVC500 Ⅱ MVC400 ...
Страница 40: ... Deployment and Connection 40 MVC800 Ⅱ ...
Страница 46: ... Deployment and Connection 46 UVC84 UVC80 UVC50 UVC40 ...