III. Base Unit and Pitch Platform assembly
Step 5.: Fold out the
Flat Cable from the Base Unit
The Flat Cable is folded inside the Base Unit. It is fixed with a tape
that has your local power supply written on it (either 110V or 220V).
Remove the tape and fold out the Flat Cable and leave it hanging
outside the Base Unit for now.
Step 6.: Loosen the fixing casters of the Pitch Platform
On both sides (front and back) of the Base Unit, you will find a pair
of fixing casters. These casters will keep the Pitch Platform in
place. Push the holder of the casters on the inside of the Base Unit
a small piece sticking out of the Base Unit on the front and back.
Step 7.: Place the Pitch Platform on the Base Unit
through the whole part. This rail is going to be between both pairs
of fixing casters. Mount the Pitch Platform on the Base Unit paying