
Arc-WorldLite 50 System Manual
ii
MOTO
MAN
EQUIPMENT DESCRIPTION (CONTINUED)
3.6
Safety Features ............................................................................................................. 3-9
3.6.1
Arc Shields ................................................................................................... 3-10
3.6.2
Fencing ......................................................................................................... 3-10
3.6.3
Emergency Stops (E-STOPS) ........................................................................ 3-10
3.6.4
ENABLE Switch ............................................................................................. 3-10
3.6.5
Interlocked Cell Door .................................................................................... 3-10
3.6.6
Interference Cubes ........................................................................................ 3-11
3.6.7
Brake Release Control ................................................................................... 3-11
4
INSTALLATION
4.1
Materials Required........................................................................................................ 4-1
4.1.1
Customer-Supplied Items ............................................................................... 4-1
4.1.2
List of Tools Required ..................................................................................... 4-1
4.2
Site Preparation ............................................................................................................ 4-2
4.3
Installing the Arc-WorldLite 50 Common Base ............................................................. 4-2
4.3.1
Removing the Shipping Brackets .................................................................... 4-3
4.4
Leveling and Securing the Cell ..................................................................................... 4-4
4.5
Connecting the Cables.................................................................................................. 4-4
4.5.1
Connecting the Earth Ground .......................................................................... 4-4
4.5.2
Connecting the Water Circulator (Optional) .................................................... 4-5
4.6
Connecting the Gas/Air Services .................................................................................. 4-6
4.7
Connecting the Power................................................................................................... 4-7
4.8
Conducting a Safety/Operation Check .......................................................................... 4-7
4.9
Installation of Tooling and Fixtures............................................................................... 4-7
5
OPERATION
5.1
Programming................................................................................................................ 5-1
5.1.1
I/O Assignment ............................................................................................... 5-1
5.2
Daily Operation ............................................................................................................. 5-2
5.2.1
Start-Up .......................................................................................................... 5-2
5.2.2
Robot Home Position ...................................................................................... 5-3
5.2.3
Starting the Master Job ................................................................................... 5-3
5.2.4
Shutdown ....................................................................................................... 5-3
5.3
System Recovery .......................................................................................................... 5-4
5.3.1
Alarms and Errors ........................................................................................... 5-4
5.3.2
E-STOP Recovery ........................................................................................... 5-4
5.3.3
Shock Sensor Recovery .................................................................................. 5-5
6
MAINTENANCE
6.1
Periodic Maintenance ................................................................................................... 6-1
6.2
Fuse and Circuit Breaker Protection.............................................................................. 6-2
Содержание Motoman SV3X
Страница 6: ...Arc WorldLite 50 System Manual iv MOTOMAN NOTES...
Страница 28: ...EQUIPMENT DESCRIPTION Arc WorldLite 50 System Manual 3 12 MOTOMAN NOTES...
Страница 36: ...INSTALLATION Arc WorldLite 50 System Manual 4 8 MOTOMAN NOTES...
Страница 42: ...OPERATION Arc WorldLite 50 System Manual 5 6 MOTOMAN NOTES...