Maintenance and inspection
9 - 54
Inspection intervals
Item number
1
Schedule (h)
Method
Operation
To be per-
formed by:
Daily
1000
6000
12000
24000
36000
1
2
3
1
Alignment marks
Visual inspection
Check alignment mark correspondence and
damage at the zero position.
2
External cables
Visual inspection
Check cables for damage.
3
Working area and robot
Visual inspection
If the working area is dirty, it must be cleaned.
Check the robot for damage and external cracks.
4
Motor for S-, L-, U-axes
Visual inspection
Check for grease leakage.
5
Fixing screws of the base
plate
Using a correspond-
ing tool,
tighten loose screws (replace if necessary).
6
Fixing screws of the cover
Using a correspond-
ing tool,
tighten loose screws (replace if necessary).
7
Power input module
Manually
Check for loose connections.
8
Toothed belt for B- and T-axes
Manually
Check for tension and wear
9
Wiring harness in the robot
(wires of the S-, L-, U-, R-, B-
and T-axis)
Visual inspection
with multimeter
Check the bushing between the connector on
the stand and the intermediate connectors by
manually moving the wires. Check the protective
coil.
2
.
Exchange
3
10
Wiring harness in the robot
(wires of the B- and T-axis)
Visual inspection
with multimeter
Check the wires between the terminals for wear.
Exchange
Содержание MA1440
Страница 1: ...ROBOTICS MA1440 YR MA01440 A00 Operating and Maintenance Manual...
Страница 18: ...Transportation 3 18 Fig 3 5 Damping material for transport A B...
Страница 32: ...Technical data 6 32 6 4 Adjustable working area...
Страница 53: ...Maintenance and inspection 9 53 1 Trained staff 2 YASKAWA trained staff 3 YASKAWA personnel...
Страница 97: ...Parts lists 11 97...