3.3 Commissioning
CAUTION!
–
Before commissioning the device must be brought to room tempera-
ture.
–
At condensation the device must be absolutely dry before connected
to power.
–
To avoid overheat during operation the device must not be laid open
to direct sun light.
–
After opening the control cabinet or desk, there are parts with pos-
sible dangerous voltage available.
–
For all signal connections only screened cables are permitted.
–
Signal cables must not be let within the same cable shaft as high
voltage cables.
3.3.1 Firmware update
To execute the firmware update an external keyboard and an USB stick (memory size
4GB) is necessary. The new image file for your Panel PC should be on the USB stick.
You will find the file and a detailed description of the firmware update on
www.vipa.com
under "Service / Support" in the download area.
In the "Startup Manager", run the Firmware update of your Panel PCs via the [Info/
Update] button.
3.3.2 Startup-Manager
As soon as the Panel PC is provided by power supply, the
Startup-Manager
will be
loaded. At the first startup of the
Startup-Manager
the following
start screen
appears.
Firmware update without
Startup Manager
Firmware update with
Startup Manager
Start screen
VIPA HMI
Deployment Panel PC
Commissioning > Startup-Manager
HB160 | PPC | 62K-PNJ0 | en | 20-20
24
Содержание 62K-PNJ0
Страница 1: ...PPC 62K PNJ0 Manual HB160 PPC 62K PNJ0 en 20 20 VIPA HMI Panel PC PPC010 CE ...
Страница 11: ...2 3 2 Interfaces VIPA HMI Hardware description Structure Interfaces HB160 PPC 62K PNJ0 en 20 20 11 ...
Страница 13: ...VIPA HMI Hardware description Structure Interfaces HB160 PPC 62K PNJ0 en 20 20 13 ...