17
STEP 4 - POST/RAIL Assembly
#8
x
3"
Scr
ew
DA: Continue attaching each Rail Assembly to the Posts, using a a 3/16" drill bit to pre-drill
a hole through each Spindle touching the post.
a
Attach using (2) #8 x 3” Wood Screws. Note: Pre-drill at an angle.
(1066) Spindle
STEP 4 - POST/RAIL Assembly
#8
x
3"
Scr
ew
DA: Continue attaching each Rail Assembly to the Posts, using a a 3/16" drill bit to pre-drill
a hole through each Spindle touching the post.
a
Attach using (2) #8 x 3” Wood Screws. Note: Pre-drill at an angle.
STEP 5 - Wa
ll A
ssembly -(x2)
Follow steps below, then complete another assembly
A: Place Beam (1062) onto one Rail/Post frame from previous
step. ˜ush t o each end then
attach togeth-er using #8 x 3” Wood Screws and 1/4 x
5“ Hex Bolt (1/4” Large Washer, Lock Nut,
135º Bracket)B: Attach Short Gusset Left (1073) and Right (1072) using 5
1/46”
x 2 1/4”
Hex BL
T (1/4 LG
Washer,
5/16 T-Nut, Lock
Washer), then tighten corner using 1/4 x 1-15/16”
Lag Screws (1/4”
Lg
Washers)
C: Repeat steps from above for one more assembly
STEP 4 - POST/RAIL Assembly
LAYOUT FOR 1 RIGHT POST ASSEMBLY
LAYOUT FOR 2 MAIN POST ASSEMBLIES
LAYOUT FOR 1 Left POST ASSEMBLY
A: Place two Post Main (1056) on each side of one Rail Assembly and attach using (2)
#8 x 2-1/2” Wood Screws. (First Image) -
Repeat for 2nd assembly.
B: Place One Post Main 1056) on the right side of the Rail Assembly and one Post Right
(1061) on the left side and attach using (2)
#8 x 2-1/2” Wood Screws. (Second Image) C: Place
One Post Main 1056) on the left side of the Rail Assembly and one Post Left(1059) on the right side
and attach using (2) #8 x 2-1/2” Wood Screws. (Third Image)
STEP 4 - POST/RAIL Assembly
LAYOUT FOR 1 RIGHT POST ASSEMBLY
LAYOUT FOR 2 MAIN POST ASSEMBLIES
LAYOUT FOR 1 Left POST ASSEMBLY
A: Place two Post Main (1056) on each side of one Rail Assembly and attach using (2)
#8 x 2-1/2” Wood Screws. (First Image) -
Repeat for 2nd assembly.
B: Place One Post Main 1056) on the right side of the Rail Assembly and one Post Right
(1061) on the left side and attach using (2)
#8 x 2-1/2” Wood Screws. (Second Image) C: Place
One Post Main 1056) on the left side of the Rail Assembly and one Post Left(1059) on the right side
and attach using (2) #8 x 2-1/2” Wood Screws. (Third Image)
D:
Place one (1056) Post Main on one side of one Rail Assembly and (1059) Post Left on the other side. Rail
Assembly should sit tight to top of post insert. See F4.7 and F4.8 for correct positioning of posts. At an angle,
attach (1064) Top Rail to posts with two #8 x 2-1/2” Wood Screws. (F4.7, F4.8, F4.9 and F4.10)
E:
For each (1066) Spindle which is next to a post, at an angle, pre-drill with a 1/8” drill bit then attach (1066)
Spindles to posts, on an angle, with two #8 x 3” Wood Screws per post. (F4.11 and F4.12)
Step 4: Attach Rail Assemblies to Posts
Part 2
STEP 4 - POST/RAIL Assembly
#8
x
3"
Scr
ew
DA: Continue attaching each Rail Assembly to the Posts, using a a 3/16" drill bit to pre-drill
a hole through each Spindle touching the post.
a
Attach using (2) #8 x 3” Wood Screws. Note: Pre-drill at an angle.
F4.7
Rail
Assembly
#8 x 2-1/2”
Wood Screw
F4.8
Notice screw
attached at an
angle
(1059)
Post Left
(flat side)
F4.9
(1056)
Post Main
(1064)
Top Rail
Post
F4.11
F4.10
Hardware
2 x #8 x 2-1/2” Wood Screw
4 x #8 x 3” Wood Screw
(1059)
Post Left
Notice groove
side faces Rail
Assembly, flat
side faces away
Notice Post Main
faces the same
direction as Post Left
Post
(1059)
Post Left
F4.12
Tight
Pre-drill and
attach screws at
an angle
#8 x 3”
Wood
Screw
(1056)
Post Main
(1066) Spindle
Post
Post
Insert
Содержание MERIDIAN OCTAGON YM11924
Страница 48: ...48 support yardistrystructures com NOTES...
Страница 49: ...49 support yardistrystructures com NOTES...