14
STEP 1 - RAILS
Follow steps below, then complete another 7 more assemblies.
C: Place Top Rail (1064) on filler (1065) flush to one end then attach
together using #8 x 1-1/2” Wood Screws from the filler side.
STEP 1 - RAILS
Follow steps below, then complete another 7 more assemblies.
C: Place Top Rail (1064) on filler (1065) flush to one end then attach
together using #8 x 1-1/2” Wood Screws from the filler side.
C:
On top of (1065) Filler and flush to each end, place (1064) Top Rail. Attach (1065) Filler to (1064) Top Rail with
three #8 x 1-1/2” Wood Screws as shown in F2.3 and F2.4.
D:
Repeat Steps A - C six more times to create seven Rail Assemblies.
Step 2: Rail Assemblies
Part 2
Hardware
Wood Parts
7 x (1064) Top Rail
21 x #8 x 1-1/2” Wood Screw
#8 x 1-1/2” Wood
Screws (x 3 per
assembly)
F2.3
F2.4
(1065)
Filler
(1064) Top Rail
(1065)
Filler
(1064)
Top Rail
Flush
Flush
Содержание MERIDIAN OCTAGON YM11924
Страница 48: ...48 support yardistrystructures com NOTES...
Страница 49: ...49 support yardistrystructures com NOTES...