Step 2.
Place the 108” 4x4 posts (1A) in place.
The pre-drilled holes need to be aligned with the holes in the
2x6’s.
Step 3.
Begin fastening the 4x4 to the 2x6’s using 6 7/8” threaded rods
with acorn nuts and washers. (6A, 6B, 6C)
Only finger tighten the nuts at this point.
Step 4.
Once the 4x4 posts are installed measure across the corners to
ensure the tower is square.
Step 1.
Begin the assembly by placing four 56” 2x6’s (1B) in a square. Place
a corner bracket (6G) at each corner.
Notice how the holes in the 2x6’s and the corner brackets are
offset and need to be aligned correctly.