Prepare - 22
SK1550 Operator’s Manual
Prepare Jobsite
Locate Utilities
Notify One-Call Services
Mark proposed path with white paint and have underground utilities located before working.
• In the US or Canada, call 811 (US) or 888-258-0808 (US and Canada). Also contact any local utilities
that do not participate in the One-Call service.
• In countries that do not have a One-Call service, contact all local utility companies to have
underground utilities located.
Verify Underground Utilities
Have an experienced locating equipment operator sweep area within 20’ (6 m) to each side of proposed
excavation to verify previously marked line and cable locations. Mark location of all buried utilities and
obstructions.
Locate Overhead Lines
Note location and height of all overhead lines in jobsite and ensure that equipment maintains proper
distance from live lines.
Overhead electrical lines. Contact will cause death or
serious injury. Know location of lines. Stay away.
Содержание 3TNV86C
Страница 1: ...SK1550 Yanmar 3TNV86C Operator s Manual CMW 053 2996 Issue 2 0 Original Instruction ...
Страница 19: ...Safety Awareness 18 SK1550 Operator s Manual Machine Safety Alerts ...
Страница 49: ...Controls 48 SK1550 Operator s Manual Operator Station ...
Страница 55: ...Drive 54 SK1550 Operator s Manual Shut Down ...
Страница 63: ...Transport 62 SK1550 Operator s Manual Retrieve ...
Страница 91: ...Service 90 SK1550 Operator s Manual Procedures ...
Страница 97: ...Specifications 96 SK1550 Operator s Manual Declaration of Conformity ...