![Yamato Pure Line Series Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/yamato/pure-line-series/pure-line-series_manual_905417015.webp)
12
2. Before operating the unit
Installation procedures
●
Connect ion exchange resin cartridges (CPC-C and CPC-E) as follows.
Remove a rubber cap from the inlet and outlet of each ion exchange resin cartridge.
・
For WL200
(1) Press the coupler with ( 2 ,OUT) mark into the
outlet (right side) of the ion exchange resin
cartridge (CPC-P) till it clicks.
(2) Press the coupler with
(
1 ,IN
)
mark into the inlet
(left side) of the ion exchange resin cartridge
(CPC-P) till it clicks.
(
See Fig. 05
)
CPC-P
樹脂
採水口へ
給水口から
カプラ
・
For WL220
(1) Press the coupler with ( 4 ,OUT) mark into the
outlet (right side) of the ion exchange resin
cartridge (CPC-E) till it clicks.
(2) Press the coupler with ( 3 ,IN) mark into the inlet
(left side) of the ion exchange resin cartridge
(CPC-E) till it clicks.
(3) Press the coupler with
(
1 ,IN
)
mark into the inlet
(left side) of the ion exchange resin cartridge
(CPC-P) till it clicks. (See Fig. 06)
WL200
CPC-P
樹脂(前)
CPC-E
樹脂(後)
採水口へ
給水口から
WL220
※
Initially, the coupler may be hard to insert and application of excessive force for insertion may
cause the insertion port to break. When this is hard to insert, carry out connection in a state as
removed from the resin installation plate while taking care not to insert in the bent state.
※
Once the coupler is inserted, pull on the hose to confirm connection and to make sure that the
coupler is not disconnected.
※
Set the coupler connected to the ion exchange resin cartridge (CPC-P) to face laterally (on the
left side as viewed from the front). If the coupler is allowed to face downward, it contacts the
door back plate to make door closing impossible.
※
When removing the ion exchange resin cartridge, relieve the pressure before disconnecting
the coupler while referring to “Before replacement of the ion exchange resin cartridge and
pretreatment cartridge (optional)” of P.29. The coupler can be removed with ease by pulling on
it while pressing a black portion to the depth. For removal, reverse the order of installation and
follow the sequence of “1
→
2
→
3
→
4.” Note also that water may drip from the ion exchange
resin cartridge when the coupler is disconnected.
※
Reverse installation of ion exchange resin cartridges or wrong connection of IN and OUT of
each cartridge may cause failure, resulting in shorter service life of the cartridges.
Fig.05
Fig.06
Coupler
To water sampling port
CPC-P resin
(front)
CPC-E resin
(rear)
CPC-P
resin
From water inlet
To water sampling port
From water inlet
Содержание Pure Line Series
Страница 2: ......