
13
2. Before Use
Installation method
⑤
After the upper and lower sections are combined, level the working surface with adjusters and
lock at the positions with lock nuts (see Fig. 2-2)
⑥
In the case of air curtain, both the outlet and the fluorescent power cord into the frame through
a through hole in the left. Similarly the switch board cord into the frame through a through
hole in the right. The other type are unnecessary.
⑦
Bring the power supply cord for power outlet and lighting and the cord for SW circuit board
into the frame through holes of left side plate and right side plate, respectively.
⑧
Bring the differential pressure measurement tubes into the frame through the hole on the right
side plate, and connect each tube to each nozzle at the back side of pre-filter differential
pressure gauge (Fig. 2-2).
Fig. 2-2
Air wheel receiver
Adjuster Magnified
view
Lock nut (tighten upward)
Adjuster lock bracket
Adjuster
Nut (Frame side)