SPEC
17
Heat protector
Main switch lead
Left handlebar switch lead
EXUP servo motor lead
Coolant reservoir tank drain hose
Fuel tank drain hose
Coolant outlet pipe
Sidestand switch lead
Oil level switch lead
A.C.magneto lead
Fuse box stay
Water hose
Stay 1
Chain case cover
Clamp the leads so that they
are positioned inner of the vehi-
cle than the washer position
after routing them between the
frame and radiator stay. Align
the clamp position with the tap-
ing sections of leads. Point the
tip of the clamp (excessive part)
to the down front side of the
vehicle. What the clamp fas-
tens at this stage are the han-
dlebar switch and main switch
leads.
Pass the main switch lead and
left handlebar switch lead
between the frame and the heat
protector.
To the coolant reservoir tank
Fold back the clamp and secure
it after passing the lead through
the clamp.
To the EXUP servo motor
Pass the coolant reservoir tank
drain hose and fuel tank drain
hose through the clamp from
the outer side of the water pump
inlet pipe after routing it behind
the water pump breather hose.
The lengths of two hose ends
are allowed to be random. Any
direction of cut edges can be
accepted. (Only for the fuel tank
drain hose)
CABLE ROUTING
Содержание YZF-R1LEVC
Страница 1: ...YZF R1V 5VY 28197 11 SUPPLEMENTARY SERVICE MANUAL LIT 11616 19 75 YZF R1VC YZF R1LEV YZF R1LEVC ...
Страница 2: ......
Страница 18: ...SPEC 10 LUBRICATION DIAGRAMS Main axle Oil delivery pipe Drive axle LUBRICATION DIAGRAMS ...
Страница 84: ......
Страница 85: ......
Страница 86: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...