–4–
CABLE ROUTING
SPEC
A Route the horn lead under the rib
of bracket horn positioning the
stepped part of protector outside
the rib.
B Make the horn lead face the out-
side.
C Route the handlebar switch lead
along the groove of the guide-air.
D Handlebar switch (right) lead
coupler.
E Fasten the wire harness and
coolant temperature sensor lead
with the clamp inserted to the
frame. Point the clamp tip down-
ward.
F To starter motor.
G To pick-up coil.
H To fuel pump.
I Insert the holding clamp of the
wire harness to the frame. Route
the starter motor lead and crank-
shaft position sensor lead under
the throttle body.
J Wiring section
K Wire the leads in front of the
clamp (excluding the brake light
switch lead). Secure the wire
harness, vehicle speed sensor
lead, neutral switch lead, brake
light switch lead, pickup coil lead
and starter lead with the clamp
inserted to the frame. Point the
tip of the clamp to the downward
(Do not bind over the bare wire!).
3
L EXUP servo motor
M To rectifier regulator
N Fasten the wire harness, (–)
lead, AC magneto lead and recti-
fier regulator lead junction with
the clamp inserted to the box
battery.
O Fasten the wire harness, AI sys-
tem lead, AC magneto lead, oil
level gauge lead, sidestand
switch lead and injector sub lead
with the clamp inserted to the
frame.
P Pay attention to the direction of
installation.
Q Connect the leads between the
clamp and the junction.
Содержание YZF-R1 2003
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 21: ... 13 LIGHTING SYSTEM ELEC EAS00780 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Страница 25: ... 17 SIGNALING SYSTEM ELEC EAS00793 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ...YZF R1 R 2003 WIRING DIAGRAM EUR ...
Страница 36: ...YZF R1 R 2003 WIRING DIAGRAM OCE ...