CHAS
4-71
Order
Job / Part
Q’ty
Remarks
Disassembling the swingarm
Disassemble the parts in the order listed.
Relay arm
1
Connecting rod
1
Cover
2
Dust seal
2
Collar
5
Bushing
5
Oil seal
8
Bearing
9
Bushing
2
Drive chain guide
1
For assembly, reverse the disassembly
procedure.
53 Nm (5.3 m•kg, 38 ft•lb)
54 Nm (5.4 m•kg, 39 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
SWINGARM AND DRIVE CHAIN