25
ASSEMBLY
x
Insert the rails (2) and (3) into the end frames of the legs.
2-1. First, insert the rail (2).
A mark “
B
” is printed on the big end face of the rail (2) and the groove section of the end frame of the
big end leg.
* Do not insert one side of the rail all the way down first, but push both sides into grooves alternately little by
little until both sides are inserted fully and stop.
Next, in the same way, insert the rail (3) securely.
A mark “
C
” is printed on the big end face of the rail (3) and the groove section of the end frame of the
big end leg.
2-2. Engage the short rail clamp located at the center of the rail (3) with the rail (2).
* Release the clamp from its holder, lift and move it to the rail (2) and push it down fully.
Rail (2)
“B” mark on the rail
and end frame.
Rail (3)
“C” mark on the rail
and end frame.
Large end
Small end
Rail clamp
Rail (3)
Rail (2)
Rail clamp
ym̲5100a̲en.pm6
07.1.19, 2:10 PM
25