
EAU18731
Removing and installing the
cowlings and panel
1. Cowling B
2. Cowling A
3. Panel A
4. Cowling C
1. Cowling D
The cowlings and panel shown need
to be removed to perform some of the
maintenance jobs described in this
chapter. Refer to this section each
time a cowling or panel needs to be
removed and installed.
EAU18900
Cowling A
To remove the cowling
1. Remove the cowling bolts.
1. Screw
2. Cowling A
2. Disconnect the turn signal light
lead connectors, and then take
the cowling off.
1. Turn signal light lead connector
To install the cowling
1. Connect the turn signal light lead
connectors.
2. Place the cowling in the original
position.
3. Install the cowling bolts.
PERIODIC MAINTENANCE AND ADJUSTMENT
6-6
6
1C0-F8199-E5.QXD 3/10/08 05:56 Página 48
Содержание XMAX 250i
Страница 87: ...W Wheel bearings checking 6 23 Wheels 6 18 INDEX 1C0 F8199 E5 QXD 23 10 08 15 33 Página 87 ...
Страница 88: ...1C0 F8199 E5 QXD 3 10 08 05 56 Página 88 ...
Страница 89: ...1C0 F8199 E5 QXD 3 10 08 05 56 Página 89 ...
Страница 90: ...1C0 F8199 E5 QXD 3 10 08 05 56 Página 90 ...
Страница 91: ...1C0 F8199 E5 QXD 3 10 08 05 56 Página 91 ...
Страница 92: ...YAMAHA MOTOR ESPAÑA S A PRINTED IN SPAIN 2008 10 NOVOPRINT S A E 1C0 F8199 E5 QXD 3 10 08 05 56 Página 92 ...