ENGINE
3-5
NOTE:
●
If the valve clearance is incorrect, record the
measured reading.
●
Measure the valve clearance in the following
sequence.
d. To measure the valve clearances of the other
cylinders, starting with cylinder #1 at TDC,
turn the crankshaft counterclockwise as
specified in the following table.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
3. Adjust:
●
Valve clearance
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Align the intake and exhaust valve lifter slots
with each other.
b. Install the tappet adjusting tool “1” between
the camshaft and the valve lifter “2”.
NOTE:
Make sure the tappet adjusting tool touches only
the valve lifter “2”, not the valve pad “3”.
c. Slowly turn the tappet adjusting tool so that
the valve pad can be removed.
Valve clearance measuring sequence
Cylinder #1
→
#2
→
#4
→
#3
A. Front
a. Degrees that the crankshaft is turned
counterclockwise
b. Cylinder
c. Combustion cycle
1
(A)
(a)
(b)
(c)
(c)
(c)
(c)
Cylinder #2
180
°
Cylinder #4
360
°
Cylinder #3
540
°
Tappet adjusting tool
90890-04110
Valve adjustment tool
YM-33966
1
1
2
1
3
Содержание XJR1300 2007
Страница 1: ...SERVICE MANUAL XJR1300 W 5WM 28197 E0 2007 ...
Страница 2: ......
Страница 8: ......
Страница 47: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 24 ...
Страница 48: ...LUBRICATION DIAGRAMS 2 25 EAS28860 LUBRICATION DIAGRAMS ...
Страница 50: ...LUBRICATION DIAGRAMS 2 27 ...
Страница 51: ...LUBRICATION DIAGRAMS 2 28 1 Drive axle 2 Push rod 3 Main axle 4 Camshaft 5 Crankshaft ...
Страница 52: ...LUBRICATION DIAGRAMS 2 29 ...
Страница 53: ...LUBRICATION DIAGRAMS 2 30 1 Nozzle 2 Bypass valve 3 Oil filter element 4 Relief valve ...
Страница 54: ...CABLE ROUTING 2 31 EAS20430 CABLE ROUTING ...
Страница 56: ...CABLE ROUTING 2 33 ...
Страница 58: ...CABLE ROUTING 2 35 ...
Страница 60: ...CABLE ROUTING 2 37 ...
Страница 62: ...CABLE ROUTING 2 39 ...
Страница 64: ...CABLE ROUTING 2 41 ...
Страница 66: ...CABLE ROUTING 2 43 ...
Страница 68: ...CABLE ROUTING 2 45 ...
Страница 70: ...CABLE ROUTING 2 47 ...
Страница 185: ...CAMSHAFTS 5 12 Refer to ADJUSTING THE VALVE CLEAR ANCE on page 3 4 10 Install Timing plate cover ...
Страница 205: ...GENERATOR 5 32 b Measure the stator coil resistances 1 2 ...
Страница 240: ...STARTER CLUTCH 5 67 1 3 2 New ...
Страница 260: ...FUEL TANK 6 3 fuel hose end in the direction of the arrow 1 ...
Страница 269: ...THROTTLE BODIES 6 12 ...
Страница 270: ...AIR INDUCTION SYSTEM 6 13 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 4 5 4 4 3 2 1 1 2 4 3 ...
Страница 274: ...AIR INDUCTION SYSTEM 6 17 ...
Страница 277: ......
Страница 278: ...IGNITION SYSTEM 7 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Страница 282: ...ELECTRIC STARTING SYSTEM 7 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Страница 288: ...CHARGING SYSTEM 7 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Страница 289: ...CHARGING SYSTEM 7 12 1 Generator 2 Main switch 4 Main fuse 7 Battery ...
Страница 291: ...CHARGING SYSTEM 7 14 ...
Страница 292: ...LIGHTING SYSTEM 7 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Страница 295: ...LIGHTING SYSTEM 7 18 ...
Страница 296: ...SIGNALING SYSTEM 7 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Страница 302: ...FUEL INJECTION SYSTEM 7 25 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Страница 342: ...FUEL PUMP SYSTEM 7 65 EAS27580 FUEL PUMP SYSTEM EAS27590 CIRCUIT DIAGRAM ...
Страница 345: ...FUEL PUMP SYSTEM 7 68 ...
Страница 346: ...IMMOBILIZER SYSTEM 7 69 EAS27640 IMMOBILIZER SYSTEM EAS27650 CIRCUIT DIAGRAM ...
Страница 355: ...IMMOBILIZER SYSTEM 7 78 ...
Страница 356: ...ELECTRICAL COMPONENTS 7 79 EAS27970 ELECTRICAL COMPONENTS EAS5UXB011 1 3 4 5 7 8 6 10 11 12 13 14 15 15 16 17 18 2 9 ...
Страница 361: ...ELECTRICAL COMPONENTS 7 84 a b Br R Br R ...
Страница 382: ......
Страница 383: ......
Страница 384: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...