2 - 24
SPEC
CABLE ROUTING DIAGRAM
Ï
Fasten the wire harness, TPS
lead (in the wire harness),
starter motor lead and negative
battery lead to the frame with a
plastic locking tie and cut off
the tie end.
Ì
Make sure that the TPS cou-
pler does not go out the chas-
sis.
Ó
Fasten the TPS lead to the
frame with a plastic band.
È
Fasten the neutral switch lead
and oil hose together with the
plastic locking ties and cut off
the tie ends.
Ô
Pass the cylinder head
breather hose through the hose
holder.
Fasten the neutral switch lead
to the frame with a plastic band
ends outward.
Ò
Fasten the neutral switch lead
and AC magneto lead to the
frame with a plastic band.
˜
Pass the cylinder head
breather hose on the outside of
the radiator hose 1 and on the
inside of the radiator pipe (radi-
ator hose 4).
ˆ
Pass the oil tank breather hose
on the outside of the AC mag-
neto lead, neutral switch lead,
lights switch lead, wire harness
and cylinder head breather
hose.
Ø
Pass the wire harness on the
outside of the neutral switch
lead and AC magneto lead.
∏
Fit the brake hose into the
guides on the protector.
Œ
Pass the wire harness through
the cable guide.
Â
Fasten the AC magneto lead,
neutral switch lead and lights
switch lead to the cable guide
at their protecting tube with a
plastic locking tie and cut off
the tie end.
Í
Pass the carburetor breather
hoses, overflow hose and cool-
ant reservoir tank breather
hose so that the hoses do not
contact the rear shock
absorber.
Содержание WR450F(R)
Страница 1: ...LIT 11626 16 43 WR450FR 5TJ 28199 10 OWNER S SERVICE MANUAL ...
Страница 2: ......
Страница 5: ......
Страница 12: ...MEMO ...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger ...
Страница 120: ...3 55 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger ...
Страница 340: ...PRINTED IN JAPAN 2002 10 2 0 1 CR E PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...