4 - 7
ENG
RADIATOR
3. Install:
●
Radiator breather hose
1
●
Radiator (right)
2
Refer to “CABLE ROUTING DIA-
GRAM” section in the CHAPTER 2.
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
4. Install:
●
Panel
1
●
Bolt (radiator panel upper)
2
NOTE:
Fit the hook
a
on the inner side first into the
radiator.
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
Содержание WR450F(R)
Страница 1: ...LIT 11626 16 43 WR450FR 5TJ 28199 10 OWNER S SERVICE MANUAL ...
Страница 2: ......
Страница 5: ......
Страница 12: ...MEMO ...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger ...
Страница 120: ...3 55 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger ...
Страница 340: ...PRINTED IN JAPAN 2002 10 2 0 1 CR E PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...