ENGINE
3-5
c. Turn the adjusting screw “3” in direction “a” or
“b” until the specified valve clearance is ob-
tained.
d. Hold the adjusting screw to prevent it from
moving and tighten the locknut to specifica-
tion.
e. Measure the valve clearance again.
f. If the valve clearance is still out of specifica-
tion, repeat all of the valve clearance adjust-
ment steps until the specified clearance is
obtained.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
7. Install:
• All removed parts
TIP
For installation, reverse the removal procedure.
EAS20600
ADJUSTING THE EXHAUST GAS VOLUME
TIP
Be sure to set the CO density level to standard,
and then adjust the exhaust gas volume.
1. Remove:
• Seat
Refer to “GENERAL CHASSIS” on page 4-1.
2. Set the main switch to “OFF”.
3. Disconnect:
• Self-diagnosis signal coupler “1”
4. Connect:
• FI diagnostic tool “2”
5. While pressing the “MODE” button “1”, turn
the main switch to “ON”.
TIP
• “DIAG” appears on the LCD “2” of the FI diag-
nostic tool.
• “POWER” LED (Green) “3” comes on.
6. Press the “UP” button “4” to select the CO ad-
justment mode “CO” or the diagnostic mode
“DIAG”.
Direction “a”
Valve clearance is increased.
Direction “b”
Valve clearance is decreased.
Tappet adjusting tool
90890-01311
Six piece tappet set
YM-A5970
T
R
.
.
Valve adjusting screw locknut
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1
2
3
a
b
b
b
FI diagnostic tool
90890-03182
2
1
FI Diagnostic Tool
DIAG
1
2
3
4
Содержание WR125R 2009
Страница 1: ...2009 SERVICE MANUAL WR125R WR125X 22B F8197 E0 ...
Страница 6: ......
Страница 8: ......
Страница 24: ...SPECIAL TOOLS 1 15 ...
Страница 51: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 26 ...
Страница 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS A 1 4 5 6 7 2 3 ...
Страница 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 1 3 2 4 ...
Страница 57: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 32 1 Camshaft 2 Crankshaft 3 Main axle 4 Drive axle ...
Страница 58: ...COOLING SYSTEM DIAGRAMS 2 33 EAS20420 COOLING SYSTEM DIAGRAMS 9 1 2 6 7 8 3 5 4 ...
Страница 64: ...CABLE ROUTING 2 39 D D D D B C C B A A E D D C C B B A A E B F A E C D 1 2 1 1 1 5 7 6 4 3 8 8 7 5 4 3 ...
Страница 66: ...CABLE ROUTING 2 41 A A B B C C A A B B A B C E D 1 2 3 4 5 6 7 8 9 12 10 11 14 13 ...
Страница 68: ...CABLE ROUTING 2 43 B B C C A A A B B C C A A B C C 1 2 3 4 3 4 5 6 7 8 9 10 11 ...
Страница 72: ...CABLE ROUTING 2 47 A A C C B B A A B C C B A B E C D 1 2 3 4 5 7 8 9 6 5 6 17 18 12 13 14 14 19 15 16 10 11 ...
Страница 78: ...CABLE ROUTING 2 53 ...
Страница 81: ......
Страница 109: ...ELECTRICAL SYSTEM 3 28 1 a b ...
Страница 110: ...ELECTRICAL SYSTEM 3 29 ...
Страница 113: ......
Страница 142: ...FRONT BRAKE 4 29 Refer to BLEEDING THE HYDRAULIC BRAKE SYSTEM on page 3 19 ...
Страница 184: ...CHAIN DRIVE 4 71 ...
Страница 248: ...CRANKCASE 5 61 A Left crankcase B Right crankcase A 1 7 11 12 3 14 2 13 4 5 6 8 9 10 16 15 B ...
Страница 258: ...TRANSMISSION 5 71 ...
Страница 277: ...THROTTLE BODY 7 8 ...
Страница 278: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 2 1 3 ...
Страница 282: ...AIR INDUCTION SYSTEM 7 13 ...
Страница 285: ......
Страница 295: ...ELECTRIC STARTING SYSTEM 8 10 ...
Страница 297: ...CHARGING SYSTEM 8 12 2 AC magneto 4 Rectifier regulator 5 Main fuse 6 Battery ...
Страница 299: ...CHARGING SYSTEM 8 14 ...
Страница 313: ...COOLING SYSTEM 8 28 ...
Страница 343: ...FUEL PUMP SYSTEM 8 58 ...
Страница 369: ......
Страница 370: ......