– 5 –
E
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
5
Band
1
Fasten the QSTS cables and handlebar switch
lead with band at the handlebar.
6
Band
1
7
Throttle cable
1
Installation steps:
• Install the throttle cable end into the throt-
tle lever.
• Fit the seal into the groove in the bracket.
• Turn the adjuster
1
in/out until the speci-
fied free play is obtained.
Throttle lever free play
e
:
4–7 mm (0.16–0.28 in)
Turn in
Free play is increased.
Turn out
Free play is decreased.
• Tighten the locknut
2
.
Содержание WaveRunner GP1300R
Страница 46: ......
Страница 47: ......
Страница 48: ...YAMAHA MOTOR CO LTD Printed in Japan Jan 2003 0 7 1 CR E F G S Printed on recycled paper ...