6-22
E
JET
PUMP
1
2
3
4
5
6
7
8
9
Intermediate housing
Intermediate housing removal
*: As required
Step
Procedure/Part name
Q
’
ty
Service points
Engine unit
Refer to
“
”
in Chapter 5.
1
Rubber damper
1
2
Band
1
Not reusable
3
Grease hose
1
4
Bolt
3
5
Intermediate housing assembly
1
6
Dowel pin
2
7
Shim
*
NOTE:
Install the shims in their original positions.
Reverse the removal steps for installation.
17 N
·
m (1.7 kgf
·
m, 12.5 ft
·
Ib)
8
×
48 mm
LT
572
LT
4
7
5
2
3
1
6
Содержание WaveRunner FX Cruiser SHO
Страница 1: ...SERVICE MANUAL FX SHO WaveRunner F1W 28197 1K 11 FX Cruiser SHO LIT 18616 03 12 LIT186160312 ...
Страница 58: ...1 53 E GEN INFO MEMO Technical tips ...
Страница 82: ...2 23 E SPEC MEMO Cable and hose routing ...
Страница 110: ...3 27 E CHK ADJ MEMO General ...
Страница 243: ...5 118 E POWR 1 2 3 4 5 6 7 8 9 MEMO Cooling water ...
Страница 275: ...6 30 E JET PUMP 1 2 3 4 5 6 7 8 9 MEMO Intermediate housing ...
Страница 353: ...E ELEC 1 2 3 4 5 6 7 8 9 7 76 MEMO Indication system ...
Страница 410: ...8 55 E HULL HOOD MEMO Deck and hull ...
Страница 429: ...9 18 E TRBL ANLS 1 2 3 4 5 6 7 8 9 MEMO Engine unit trouble analysis ...
Страница 431: ......
Страница 432: ...YAMAHA MOTOR CORPORATION USA Printed in USA Jan 2008 0 0 1 CR E ...