5-40
E
POWR
1
2
3
4
5
6
7
8
9
2. Install:
•
Supercharger
Installation step:
1. Tighten the supercharger bolts
1
, and
then bolts
2
to the specified torque.
T
R
.
.
Supercharger bolt (M8
×
65 mm)
1
:
20 N
·
m (2.0 kgf
·
m, 14.8 ft
·
lb)
LOCTITE 242
Supercharger bolt (M6
×
65 mm)
2
:
10 N
·
m (1.0 kgf
·
m, 7.4 ft
·
lb)
LOCTITE 242
2
1
1
LT
242
Air cooler intake hose installation
1. Install:
•
Air cooler intake hose
1
Installation steps:
1. Install the air cooler intake hose
1
between the supercharger and air cooler.
NOTE:
•
Make sure that the arrow mark
a
on the air
cooler intake hose
1
is pointing up.
•
Make sure that the hose
1
contacts the pro-
jection
b
on the air cooler.
2. Tighten each clamp
2
to the specified
torque.
NOTE:
Fit each hose clamp
2
over the white paint
mark
c
on each end of the air cooler intake
hose
1
, making sure that the fastener of the
clamp is aligned with the wide portion of the
paint mark as shown.
T
R
.
.
Air cooler intake hose clamp:
4 N
·
m (0.4 kgf
·
m, 3.0 ft
·
lb)
b
1
2
a
c
1
2
c
Содержание WaveRunner FX Cruiser SHO
Страница 1: ...SERVICE MANUAL FX SHO WaveRunner F1W 28197 1K 11 FX Cruiser SHO LIT 18616 03 12 LIT186160312 ...
Страница 58: ...1 53 E GEN INFO MEMO Technical tips ...
Страница 82: ...2 23 E SPEC MEMO Cable and hose routing ...
Страница 110: ...3 27 E CHK ADJ MEMO General ...
Страница 243: ...5 118 E POWR 1 2 3 4 5 6 7 8 9 MEMO Cooling water ...
Страница 275: ...6 30 E JET PUMP 1 2 3 4 5 6 7 8 9 MEMO Intermediate housing ...
Страница 353: ...E ELEC 1 2 3 4 5 6 7 8 9 7 76 MEMO Indication system ...
Страница 410: ...8 55 E HULL HOOD MEMO Deck and hull ...
Страница 429: ...9 18 E TRBL ANLS 1 2 3 4 5 6 7 8 9 MEMO Engine unit trouble analysis ...
Страница 431: ......
Страница 432: ...YAMAHA MOTOR CORPORATION USA Printed in USA Jan 2008 0 0 1 CR E ...