5-1
E
POWR
ENGINE UNIT
ENGINE UNIT
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
ENGINE UNIT REMOVAL
Follow the left “Step” for removal.
Engine oil
Drain.
Refer to “POWER UNIT” in Chapter 3.
Storage compartment panel
Refer to “FRONT HOOD” in Chapter 8.
Battery negative and positive lead
Refer to “FUSE BOX” in Chapter 7.
Fuel hose
Refer to “FUEL INJECTION SYSTEM” in
Chapter 4.
Water lock and exhaust joint
Refer to “EXHAUST SYSTEM” in Chapter 8.
1
Bolt/washer
2/2
2
Fuse box
1
14
10
10
2
1
13
3
4
11
15
12
8
7
9
6
5
2nd 18 N • m (1.8 kgf • m, 13 ft • Ib)
1st 8.8 N • m (0.88 kgf • m, 6.4 ft • Ib)
8
×
35 mm
6
×
25 mm
7.8 N • m (0.78 kgf • m, 5.6 ft • Ib)
8
×
35 mm
17 N • m (1.7 kgf • m, 12 ft • Ib)
17 N • m (1.7 kgf • m, 12 ft • Ib)
8
×
40 mm
17 N • m (1.7 kgf • m, 12 ft • Ib)
10
LT
242
LT
LT
572
LT
LT
271
Содержание VX110 Sport
Страница 1: ...SERVICE MANUAL VX110 Sport WaveRunner F1K 28197 1H 11 LIT 18616 02 91 LIT186160291 VX110 Deluxe ...
Страница 8: ......
Страница 20: ......
Страница 48: ......
Страница 96: ......
Страница 224: ......
Страница 291: ......
Страница 332: ......
Страница 344: ......
Страница 345: ...YAMAHA MOTOR CORPORATION USA Printed in USA Jan 2005 0 0 1 CR E_4 ...