FRONT FORK SPRING PRELOAD ADJUSTMENT
3-29
CC
CAUTION:
Tighten the pinch bolts to specified
torque. If torqued too much, it may cause
the front fork to malfunction.
NOTE:
Adjust the installation angle of the steering
damper stay so that the dimension
d
is
between 3 mm (0.12 in) and 5 mm (0.20 in)
when the handlebar is turned fully to the
right.
4. Check:
• Steering smooth action
Turn the handlebar to make sure no parts
are being contacted with others.
Contact
≥
Repair.
5. Install:
• Front fender
• Front wheel
• Induction guide (left cylinder)
• Cowling
EC36F012
FRONT FORK SPRING PRELOAD ADJUST-
MENT
1. Adjust:
• Spring preload
By turning the adjuster
1
.
Stiffer
a
a
≥
≥
Increase the spring preload.
(Turn the adjuster
1
1
in.)
Softer
b
b
≥
≥
Decrease the spring preload.
(Turn the adjuster
1
1
out.)
INSP
ADJ
Extent of adjustment:
Maximum
Minimum
Fully turned-in
Fully turned-out
position
position
]
Содержание TZ250M
Страница 1: ...5KE 28199 10 LIT 11626 13 41 OWNER S SERVICE MANUAL TZ250M1 M ...
Страница 11: ...MEMO ...
Страница 15: ...CHAPTER 7 TUNING ENGINE 7 1 CHASSIS 7 14 ...
Страница 287: ...99 9 0 1x1 ...