HANDLEBAR
5-40
EC5B0000
HANDLEBAR
Extend of removal:
1
Handlebar removal
2
Throttle disassembly
Extend of removal
Order
Part name
Q’ty
Remarks
HANDLEBAR REMOVAL
Preparation for
Cowling
Refer to “COWLING, INDUCTION
removal
Induction guide (left cylinder)
GUIDE, SEAT AND FUEL TANK”
section in the CHAPTER 4.
Handle crown
Refer to “STEERING” section.
1
Clutch cable
1
Disconnect at the lever side.
2
Clutch lever holder
1
3
Main switch
1
4
Grip (left)
1
Refer to “REMOVAL POINTS”.
5
Starter cable
2
Disconnect at the lever side.
6
Starter lever
1
7
Master cylinder
1
8
Grip cap (upper)
1
9
Throttle cable
2
10
Throttle
1
11
Grip cap (lower)
1
12
Grip end
2
13
Handlebar
2
14
Grip (right)
1
Refer to “REMOVAL POINTS”.
15
Tube guide
1
CHAS
T
2 Nm (0.2 m
d
kg, 1.4 ft
d
lb)
T
7 Nm (0.7 m
d
kg, 5.1 ft
d
lb)
T
7 Nm (0.7 m
d
kg, 5.1 ft
d
lb)
T
8 Nm (0.8 m
d
kg, 5.8 ft
d
lb)
2
2
1
Содержание TZ250M
Страница 1: ...5KE 28199 10 LIT 11626 13 41 OWNER S SERVICE MANUAL TZ250M1 M ...
Страница 11: ...MEMO ...
Страница 15: ...CHAPTER 7 TUNING ENGINE 7 1 CHASSIS 7 14 ...
Страница 287: ...99 9 0 1x1 ...