4 - 55
ENG
KICK AXLE AND SHIFT SHAFT
EC4B4400
Shift shaft
1. Inspect:
●
Shift shaft
1
Bend/damage
→
Replace.
●
Spring
2
Broken
→
Replace.
EC4B4500
Stopper lever
1. Inspect:
●
Stopper lever
1
Wear/damage
→
Replace.
●
Torsion spring
2
Broken
→
Replace.
EC4C5000
ASSEMBLY AND INSTALLATION
Segment
1. Install:
●
Segment
1
●
Screw (segment)
2
NOTE:
●
Align the notch
a
on the segment with the
pin
b
on the shift cam.
●
Tighten the screw using the T30 bit.
Stopper lever
1. Install:
●
Stopper lever
1
●
Bolt (stopper lever)
2
●
Torsion spring
3
NOTE:
Align the stopper lever roller with the slot on
segment.
T
R
.
.
12 Nm (1.2 m · kg, 8.7 ft · lb)
LT
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
LT
Содержание TT-R125
Страница 1: ...TT R125 W TT R125E W TT R125LW W TT R125LWE W LEW 1B2 F8199 82 ...
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL ...
Страница 49: ...GEN INFO MEMO ...
Страница 185: ...INSP ADJ MEMO ...
Страница 256: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 257: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 310: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 577: ... ELEC MEMO ...
Страница 591: ... ELEC MEMO ...
Страница 611: ... ELEC MEMO ...
Страница 614: ......
Страница 615: ......
Страница 616: ...PRINTED IN BRAZIL E F G 05 2005 910 GYL 04 2006 1000 GYL ...