4 - 54
ENG
KICK AXLE AND SHIFT SHAFT
REMOVAL POINTS
Kick axle
1. Remove:
●
Kick axle assembly
1
NOTE:
Unhook the torsion spring
2
from the hole in
the crankcase.
Segment
1. Remove:
●
Screw (segment)
●
Segment
1
NOTE:
Loosen the screw using the T30 bit.
INSPECTION
Kick axle and kickstarter segment gear
1. Check:
●
Kickstarter segment gear smooth
movement
Unsmooth movement
→
Replace.
2. Inspect:
●
Kick axle
1
Wear/damage
→
Replace.
Kickstarter segment gear and kick idle gear
1. Inspect:
●
Kickstarter segment gear
1
●
Kick idle gear
2
●
Gear teeth
a
Wear/damage
→
Replace.
Kick axle clip
1. Measure:
●
Kick axle clip friction force (torsion
spring)
Out of specification
→
Replace.
Use a spring gauge
1
.
Kick axle clip friction force:
0.65 ~ 1.35 kg (1.4 ~ 3.0 lb)
Содержание TT-R125
Страница 1: ...TT R125 W TT R125E W TT R125LW W TT R125LWE W LEW 1B2 F8199 82 ...
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL ...
Страница 49: ...GEN INFO MEMO ...
Страница 185: ...INSP ADJ MEMO ...
Страница 256: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 257: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 310: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 577: ... ELEC MEMO ...
Страница 591: ... ELEC MEMO ...
Страница 611: ... ELEC MEMO ...
Страница 614: ......
Страница 615: ......
Страница 616: ...PRINTED IN BRAZIL E F G 05 2005 910 GYL 04 2006 1000 GYL ...