4 - 65
ENG
7. Install:
●
Crankcase cover (left)
8. Connect:
●
Neutral switch lead
1
NOTE:
Pass the neutral switch lead into the crank-
case cover groove as shown.
9. Connect:
●
CDI magneto lead
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
CDI MAGNETO AND STARTER CLUTCH
(TT-R125E/TT-R125LWE)
Содержание TT-R125(S)
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 179: ...INSP ADJ MEMO...
Страница 250: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 251: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 304: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 571: ...ELEC MEMO...
Страница 585: ...ELEC MEMO...
Страница 605: ...ELEC MEMO...
Страница 608: ......
Страница 609: ......
Страница 610: ...PRINTED IN JAPAN 2003 3 1 1 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...