5 - 24
CHAS
REAR WHEEL AND REAR BRAKE
Extent of removal:
1
Rear wheel removal
2
Wheel bearing removal
3
Brake shoe plate assembly removal and disassembly
Extent of removal
Order
Part name
Q’ty
Remarks
Preparation for removal
REAR WHEEL AND DRUM
BRAKE
Hold the machine by placing the
suitable stand under the engine.
WARNING
Support the machine securely so there is no
danger of it falling over.
1
Brake rod
1
2
Axle nut
1
3
Drive chain puller (right)
1
4
Wheel axle
1
5
Drive chain puller (left)
1
6
Drive chain
1
7
Rear wheel
1
Refer to “REMOVAL POINTS”.
8
Collar (right)
1
9
Brake shoe plate assembly
1
10
Collar (left)
1
2
3
1
REAR WHEEL AND REAR BRAKE
Содержание TT-R125(R)
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 47: ...GEN INFO MEMO...
Страница 157: ...INSP ADJ MEMO...
Страница 254: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 501: ...ELEC MEMO...
Страница 508: ......
Страница 509: ......
Страница 510: ...PRINTED IN JAPAN 2002 04 1 2 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...