6-8
PERIODIC MAINTENANCE AND MINOR REPAIR
6
3. Pull the cowling down slightly,
and then pull it outward as
shown.
EAU03632
Cowling B
Cowling *
To remove the cowling
1. Pull up the right floorboard mats
as shown.
1
2
1.
Mat A
2.
Mat B
To install the cowling
1. Insert the tabs on the cowling
into the slots as shown, and then
install the screws.
2. Place the floorboard mats in the
original position.
ECA00067
c
C
Take care not to damage the tabs
on the cowling when removing and
or installing it.
1
1.
Tab (
×
10)
5SJ-28199-E1 7/11/02 11:03 AM Page 57
Содержание MAJESTY YP250A
Страница 1: ...OWNER S MANUAL 5SJ 28199 E1 YP250A ...
Страница 2: ...5SJ 28199 E1 7 11 02 11 03 AM Page 112 ...
Страница 8: ...5SJ 28199 E1 7 11 02 11 03 AM Page 6 ...
Страница 12: ...5SJ 28199 E1 7 11 02 11 03 AM Page 10 ...
Страница 13: ...DESCRIPTION Left view 2 1 Right view 2 2 Controls and instruments 2 3 2 5SJ 28199 E1 7 11 02 11 03 AM Page 11 ...
Страница 41: ...PRE OPERATION CHECKS Pre operation check list 4 1 4 5SJ 28199 E1 7 11 02 11 03 AM Page 39 ...
Страница 96: ...5SJ 28199 E1 7 11 02 11 03 AM Page 94 ...
Страница 97: ...SCOOTER CARE AND STORAGE Care 7 1 Storage 7 4 7 5SJ 28199 E1 7 11 02 11 03 AM Page 95 ...
Страница 103: ...SPECIFICATIONS Specifications 8 1 Conversion table 8 5 8 5SJ 28199 E1 7 11 02 11 03 AM Page 101 ...
Страница 114: ...5SJ 28199 E1 7 11 02 11 03 AM Page 112 ...
Страница 115: ...5SJ 28199 E1 7 11 02 11 03 AM Page 112 ...
Страница 116: ...PRINTED ON RECYCLED PAPER PRINTED IN JAPAN 2002 8 0 1 1 YAMAHA MOTOR CO LTD E ...