8-18
–
+
ELEC
E
IGNITION CONTROL SYSTEM
CHECKING THE BATTERY
8
Refer to “CHECKING THE BATTERY”
on page 3-19.
CHECKING THE FUSES
8
Refer to “CHECKING THE FUSES” on
page 8-13.
CHECKING THE FUSE HOLDER
8
Refer to “CHECKING THE FUSE
HOLDER” on page 8-13.
MEASURING THE PULSER COIL
OUTPUT PEAK VOLTAGE
8
Refer to “MEASURING THE PULSER
COIL OUTPUT PEAK VOLTAGE” on
page 8-15.
MEASURING THE CRANK POSITION
SENSOR OUTPUT PEAK VOLTAGE
8
Measure:
• Crank position sensor output peak
voltage
Below specification
→
Replace.
Crank position sensor output
peak voltage
Green (G) – Green/blue (G/L)
r/min
Circuit
Loaded
Cranking
1,500
3,500
V
4.5
4.0
13
20
Test harness (2-pin)
YB-06767 / 90890-06767
G
/
L
G
8310
Содержание LZ200N
Страница 1: ...68F 28197 Z9 A1 WORLDWIDE Z200N LZ200N Z200Y LZ200Y USA CANADA SERVICE MANUAL 290369 ...
Страница 8: ......
Страница 20: ......
Страница 35: ......
Страница 183: ......
Страница 277: ......
Страница 378: ......
Страница 391: ......
Страница 392: ...Printed on recycled paper Printed in Japan Oct 1999 0 6 1 CR Z200NETO LZ200NETO YAMAHA MOTOR CO LTD ...