5-4
E
POWR
MUFFLER ASSEMBLY
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
6
Screw clamp/cooling water hose
1/1
È
To cooling water pilot outlet (port)
Route the cooling hose under the exhaust
chamber assembly.
7
Screw clamp/cooling water hose
1/1
É
To cooling water outlet (stern)
Contact the corrugated tube to the hose
screw clamp (muffler assembly end).
4
7
5
6
1
2
3
È
6
×
22 mm
12 N • m (1.2 kgf • m, 8.7 ft • Ib)
LT
242
É
Содержание GP1300R WaveRunner 2003
Страница 1: ...SERVICE MANUAL GP1300R WaveRunner F1G 28197 1F 11 LIT 18616 02 44 LIT186160244 ...
Страница 259: ...8 31 E HULL HOOD SEAT AND HANDGRIP SERVICE POINTS Seat lock inspection 1 Check Seat lock Damage wear Replace ...
Страница 279: ...YAMAHA MOTOR CORPORATION USA Printed in USA Feb 2003 0 0 1 CR E ...