
PERIODIC MAINTENANCE AND ADJUSTMENT
7-10
7
2. Remove the quick fastener and
the bolts, and then take the cowl-
ing off.
3. Remove the turn signal light lead
from the guide, and then discon-
nect the turn signal light lead cou-
pler.
To install a cowling
1. Connect the turn signal light cou-
pler, and then route the turn signal
light lead through the guide.
2. Place the cowling in the original
position, and then install the bolts
and the quick fastener.
3. Install cowling A.
EAU46770
Panel A
To remove the panel
Remove the bolt and the quick fasten-
er, and then take the panel off.
1. Cowling B
2. Quick fastener
3. Bolt
3
3
2
1
1. Turn signal light lead
2. Guide
3. Turn signal light lead coupler
1
2
3
U36P14E0.book Page 10 Thursday, August 2, 2012 2:13 PM
Содержание FZ6RD(C)
Страница 10: ...LOCATION OF IMPORTANT LABELS 1 3 1 7 California only U36P14E0 book Page 3 Thursday August 2 2012 2 13 PM ...
Страница 11: ...LOCATION OF IMPORTANT LABELS 1 4 1 1 U36P14E0 book Page 4 Thursday August 2 2012 2 13 PM ...
Страница 12: ...LOCATION OF IMPORTANT LABELS 1 5 1 1 California only U36P14E0 book Page 5 Thursday August 2 2012 2 13 PM ...
Страница 116: ...U36P14E0 book Page 3 Thursday August 2 2012 2 13 PM ...
Страница 118: ...PRINTED IN JAPAN 2012 08 0 9 1 CR E DIC183 PRINTED ON RECYCLED PAPER ...