PRE-DELIVERY INSPECTION REPORT
f.
Wheels
Tyre
:
Tyre pressure Solo Double
(PSI)
Front 25 25
Rear 32 32
Rim
:
Runout - Radial - 1.5 mm (Max)
- Lateral - 1.5 mm (Max)
Spokes
:
No loosenes
g.
Locks Operation
:
• Ignition
• Steering
• Fuel Tank Cap
• Side Cover (L.H.)
h.
Fasteners
Specified Torque
(Ft-Lb)
1. Front Wheel Axle Nuts
25-40
2. Front Fork (Crown Handle & Inner Tube)
13-20
2. Front Fork under Bracket Stem Nut
18-22
3. Handle Bar Mounting Bolts
13-20
4. Rear Shock Absorber Mounting Bolts
22-35
5. Rear Swing Arm Pivot Shaft Nut
32-52
6. Rear Wheel Axle/Sprocket. Shaft Nuts
60-70
B. ENGINE
a.
Engine Oil
:
• Oil Level (For checking - Refer Pg. 6-8)
• Check for any Leakages
10-2
SERVICE2.PMD
10/1/2005, 12:57 PM
2
Содержание Fazer
Страница 73: ...NOTES NOTES IF REQUIRED pmd 10 1 2005 1 14 PM 3 ...
Страница 74: ...NOTES NOTES IF REQUIRED pmd 10 1 2005 1 14 PM 2 ...